BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 21, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Naples, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of October 28, 2021, this project already been awarded but the award information is not yet available at this time. The project already started with 180 days of completion. The purpose of this solicitation is to award to the lowest, qualified and responsive vendor from RFP #19-7646 for design, permitting, and construction of the Sports Park bus stop improvement. Construction shall comply with the latest edition of FDOT Standard Specifications for Road and Bridge Construction, FDOT Design Standards, and Americans with Disabilities Standards for Accessible Design. Contractor shall follow the Collier County standard construction processes and procedures as outlined in said document. A Maintenance of Traffic (MOT) plan will be required for each site showing MOT to be used during construction, with sidewalk closures and detours and lane closures. The awardee must provide all the necessary items, tools, hardware, resources, materials, etc. to complete all project tasks fully and properly. Must provide all necessary permitting and any documentation, sketches, fees, etc., required for permits. The awardee will pay all necessary permit fees. This will be a grant funded project and Davis Bacon and Federal Grant Provisions will apply. Contractor is responsible to provide all required documentation in a timely manner and must comply with all grant provisions. All grant documentation must be submitted within five (5) calendar days after notice of award. The awarded contractor will receive a purchase order for work and may not start prior to receiving a Notice to Proceed (NTP). The NTP will not be issued until all grant requirements have been met. The project shall be completed within 90 calendar days of the NTP. Estimated Amount: $31,000.00

Bid Results

Sidewalks / Parking Lot

$27,988.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
39
Bidding Soon
710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2021

February 14, 2022

Project location map

8520 Rattlesnake Hammock Rd, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.