Published October 14, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for site work for a water / sewer project.

Work includes installation of approximately 2,400 linear feet of 12-inch irrigation pump station suction piping from the Battle Creek Tank to the Battle Creek Golf Course Irrigation Pump Station and construction of three (3) cast-in-place valve vaults and associated piping at the Battle Creek Tank Site. A related project titled Battle Creek Golf Course Irrigation Pump Station Replacement (Project A) will include construction of a new Battle Creek Golf Course Irrigation Pump Station. The delineation between Project A and Project B is defined in the Contract Drawings. Contract time for the project shall be Two Hundred Twenty-Four (224) calendar days. Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but BAMA may require such statements prior to award of the construction contract. The Statement of Qualifications & Experience using the form found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in BAMA considering the Bid non-responsive and result in rejection of the Bid by BAMA. Bidders may be required to provide supplemental information if requested by BAMA to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to BAMA a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: formwork and placement; concrete placement and finishing; reinforcing steel placement and tying; excavation; grading; shoring; waterline installation. Such list shall be accompanied by a Statement of Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If BAMA or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, BAMA may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, BAMA may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by BAMA, submit to BAMA the above required list of the Subcontractors, Suppliers, and other individuals or entities. Bidders must demonstrate, at a minimum, successful completion of at least three waterline projects with a minimum size of 12" and minimum length of 2,000' each that are similar in nature and scope to this project within the last five years. In evaluating whether a Bidder is responsible, BAMA will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to BAMA. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by BAMA in the amounts equal to the Contract price. The acceptance and award of this Bid will be considered by BAMA. BAMA reserves the right to reject any or all Bids. Project will be awarded to the responsible Bidder with the lowest base bid or lowest combined base and additive alternate bids, if any, which is most advantageous to BAMA. Applicable additive alternates, if any, will be determined at BAMA's discretion. The lowest responsible Bidder will be notified within ten (10) working days of the Bid opening as to when this Public Construction Contract will be placed on the BAMA Agenda for consideration.

Award

Water / Sewer

$969,100.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Existing Products, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Other Specialties, Scales
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Decentralized HVAC Equipment, Radiant Heating Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Electrical Utility Transmission and Distribution, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks, Specialty Material Handling Equipment, Lubrication Systems, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
58
Bidding Soon
738
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2021

October 22, 2021

img_map_placeholder

1051 W Omaha St, Broken Arrow, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Battle Creek Tank Inlet/Outlet Modifications and 12-Inch

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.