Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Surprise, Arizona. Working plans call for site work for a road / highway; and for paving for a road / highway.
This project will deliver the full design and construction of Sweetwater Avenue from Sarival Avenue to Loop 303. Specific improvements within this segment of Sweetwater Avenue will construct a four lane minor arterial roadways with a two-way left turn lane, provisions for drainage, sidewalks, bicycle lane, street lighting, landscaping, and a signal at the intersection of Sweetwater Avenue and Sarival Road. This project will be constructed with cooperation with the adjacent developers and may be eligible for developer reimbursement due to the Municipal Code that requires private property developers to build the roadway fronting their property. Project is included City of Surprise FY 2022-2026 CIP Page 280 As of February 24, 2022, this project is awaiting comments from their second review with the City of Surprise. After receiving comments, this project could be approved to move on to permitting. A construction manager has been awarded. Information regarding future bidding opportunities has not been released. Although a timeline for construction has not been confirmed, construction could commence in April of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. __________________________________________________________________________________________________________________________________ *The closed solicitation below is kept for reference.* __________________________________________________________________________________________________________________________________ Request for Qualifications (RFQ) 321210PC Sweetwater Avenue Improvements New Construction The City of Surprise is accepting Request for Qualifications (RFQ) Construction Manager at Risk Services. PROJECT DESCRIPTION: This will be a Construction Manager-at-Risk Project pursuant to Arizona Revised Statutes Title 34. This project is for the construction of a segment of Sweetwater Avenue from Sarival Avenue to SR303. This new section of Sweetwater Avenue will have two lanes in each direction with a two-way left turn lane down the middle. Sweetwater Avenue will provide an additional route for traffic into and out of the Prasada Entertainment district The City of Surprise intends to procure a Construction Manager at Risk (CM@R) to construct the improvements described in Section 3 above. This project will be constructed pursuant to A.R.S. 34-601 et seq. The total program budget for the project is approximately $4.27M, including direct and indirect costs for the entire project. The City of Surprise ("City") is seeking a qualified General Contractor to lead the Construction of the new section of Sweetwater Avenue will have two lanes in each direction with a two-way left turn lane down the middle. Sweetwater Avenue will provide an additional route for traffic into and out of the Prasada Entertainment district. It is anticipated the CMAR contractor will be brought on board at about 60% design. The construction of the project will incorporate, but not be limited to: o Two lanes in each direction and a two-way left turn lane o Curb and gutter o Water and sewer utilities the entire length of the new roadway o Conduit for future signals o Drainage features o Sidewalk o Street Light Installation o Coordinating utility conflicts
Pre-Construction/Negotiated
Roads / Highways
$4,265,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2021
December 5, 2022
Sweetwater Dr, Surprise, AZ
Related To This Project
Surprise, AZ
Bid Date: Jan 03 2019
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
Bid Date: Sep 09 2022
Surprise, AZ
--
Surprise, AZ
Bid Date: Sep 28 2022
Surprise, AZ
--
Surprise, AZ
--
Surprise, AZ
Bid Date: Aug 11 2022
Surprise, AZ
Bid Date: Aug 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.