Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 18, 2022 at 8:00 PM
Updated October 24, 2023
Site work for a water / sewer project in Fort Pierce, Florida. Conceptual plans call for site work for a water / sewer project.
As of May 18, 2022, a shortlist has been released. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Design and Permitting of the following projects: 1. Approximately 25,000 lineal feet of 6" force main from the Fairgrounds wastewater treatment plant along Okeechobee Road and tie into existing force main. Approximately 25,000 lineal feet of 12" water main along Okeechobee Road in order to loop the Midway Road and Okeechobee Road corridors water mains. 2. Approximately 9,000 lineal feet of 6" force main along Midway Road from a point approximately 5,700 lineal feet west of I95 to a point approximately 3,300 lineal feet east of I95 then north approximately 8,000 through existing easement and connect to existing dryline force main and approximately 300 lineal feet on Gordy Road to connect the existing dryline force main to the existing active force main on Okeechobee Road. 3. Approximately 3,250 lineal feet of 8" water main on US1 between the Turnpike Feeder Road and the St. Lucie/Indian River County line. Approximately 8,200 lineal feet of 12" water main on Indrio Road between Emerson Avenue and Taylor Dairy Road 4. Water and wastewater trunk lines, associated repump stations and disinfectant stations from the North County area to the South County area, approximately 20 miles, remaining in the St. Lucie County Utilities service area wherever possible to maximize potential customer connections. 5. Approximately 17,000 lineal feet of water distribution system in the Queens Cove subdivision to replace existing water distribution system. Approximately 13,500 lineal feet of water distribution system in the Fort Pierce Shores subdivision to replace existing water distribution system.
Conceptual
Water / Sewer
$500,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2022
Multiple Locations, Fort Pierce, FL
Related To This Project
Fort Pierce, FL
Bid Date: May 18 2022
Fort Pierce, FL
Bid Date: May 18 2022
Fort Pierce, FL
Bid Date: May 18 2022
Fort Pierce, FL
Bid Date: May 18 2022
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
Bid Date: Dec 18 2024
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
