BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Estes Park, Colorado. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

The Upper Thompson Sanitation District (Owner) is seeking Proposals for construction manager at-risk (CMAR) services for the WRF and Lift Station Improvements Project (Project). Proposals will be reviewed and evaluated by the District and a short list of up to three (3) contractors will be identified for interviews/teaming assessments. Information regarding the interview process and selection criteria will be provided to the short-listed contractors. Certified Disadvantaged Business Enterprises (DBE) are encouraged to propose. At the completion of the interview process the Owner will select a contractor (Contractor) to award the CMAR Services. Merrick & Company (Engineer) is contracted directly with the Owner to design the Project. The CMAR Services award has two phases: 1. Phase 1: Preconstruction Services: The Contractor will provide preconstruction services to support the Engineer in developing the Project design upon successful agreement between the Owner and Contractor (Preconstruction Services Agreement) on construction price, risk identification, quantification, and mitigation (risk support), schedule, and reporting requirements. A draft Preconstruction Services Agreement is included as Appendix A. The Contractor will provide cost estimating, constructability reviews, risk support, and scheduling throughout the Project design. The Engineer will advance the design to the level of completion necessary to define the Project (60% and 90% complete) and will provide construction/procurement-ready Contract Documents to the Owner and the Contractor. The Contractor will present to the Owner a construction schedule, risk log, and an open-book guaranteed maximum price (GMP) for the Project, which includes the cost of the work through commissioning and start-up, a general conditions price, overhead and profit as a percent mark-up, and a negotiated Contractor contingency. One (1) GMP will be developed for this Project with four (4) primary components as follows: A.Fish Creek Lift Station (FCLS) B.Wapiti Lift Station (WLS) C.WLS Force Main D.Water Reclamation Facility (WRF) Construction Services will begin when the Owner and Contractor have agreed on the construction price, risk, schedule, and reporting requirements. The Owner reserves the right to terminate the Contractor and begin negotiating with another Contractor, or direct the Engineer to complete the design and prepare construction documents for bidding of the Project and/or the GMP components, if the Owner and the Contractor are unable to agree on construction price, schedule, risk allocation, and reporting requirements. Phase 2: Construction Services: The Contractor will procure subcontractors, suppliers, and vendors and will be responsible for the construction, startup, commissioning, operator training and support, performance testing, and warranty services upon successful agreement between the Owner and Contractor (Construction Services Agreement) on construction price, schedule, risk allocation, and reporting requirements. The Construction Services Agreement(s) for each GMP component will be developed using the 2018 Engineers Joint Contract Documents Committee (EJCDC) forms, general conditions and Owners' supplemental conditions. A copy of the draft construction agreement is included as Appendix B. Up to four (4) construction work areas will be developed for the GMP identified above. The Owner reserves the right to terminate the Contractor and begin negotiating with another Contractor, or direct the Engineer to complete the design and prepare construction documents for bidding of the Project and/or any of the four (4) primary components, if the Owner and the Contractor are unable to agree on construction price, schedule, risk allocation, reporting requirements, or if the quality of the work is unacceptable. The Contractor shall be responsible for actively tracking Project cost, risks, and schedule to provide confirmation that the design and construction for each Project work area is completed with the Owners' budget. The RFP is subject to revision after the date of issuance via addenda. The Owner reserves the right to reject any or all proposals, to waive any informality in any proposal, to readvertise for proposals, or to withhold the award for any reason the Owner determines. Each contractor shall provide the Owner an acknowledgement that they have received the RFP, that they intend to submit a proposal, and that they will attend the mandatory pre-submittal meeting within 7 days of receipt of this RFP. Such acknowledgement shall identify and provide full contact information for the contractor representative, who shall be the contractor's single point of contact for the receipt of future documents, notices, and addenda associated with this RFP. Such acknowledgement shall be sent in writing and transmitted electronically via email to the Owner and Engineer. Bid submittal - In order to be considered for the Project, an original proposal response to this RFP shall be submitted containing an original authorized signature, together with 9 printed copies, and 1 electronic version on USB flash drive in PDF format. An MSExcel file containing Proposal Appendix B - Fee and Rate Proposal shall be included on the USB flash drive. Each contractor assumes full responsibility for timely delivery of its proposal at the required location. Proposals received after the submittal deadline will be deemed non-responsive and returned. The delivered packaging containing the proposal documents shall note the following on its face: Request for Proposals (RFP) for CMAR Services Upper Thompson Sanitation District WRF and Lift Station Improvements Mailed submittals must be received by Owner by the date and time noted in the schedule. Pre bid meeting - The pre-submittal meeting shall be led by the contractor, will be conducted via video conference, is limited to one (1) per contractor, and shall be a maximum of 1.5 hours. Contact Steve Ravel at 303-906-2710 or steven.ravel@merrick.com to request a meeting (date and time). Meetings will be scheduled at 10 am and 1 pm during the, depending on staff availability. General Requirements - Insurance Required - Contractors License Required - Prevailing Wage Required Question Acceptance Deadline 07/05/2022 07:00 PM EDT Questions are submitted online Yes Piggyback Contract No

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
40
Bidding Soon
966
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

March 13, 2023

img_map_placeholder

Multiple Locations, Estes Park, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.