BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fontana, California. Completed plans call for site work for a water / sewer project.

In general, the project is located on Valley Blvd. W/O Sierra to Palmetto requires the contractor to provide all materials, equipment, labor, tools, and incidentals as required by the contract documents. This project consists of the new installation of approximately 500 LF of 15-inch VCP, 20 LF of 10-inch VCP and the install of CIPP liner on the existing 3,000 ft. of sewer line. Response Types : Line Items Subcontractor Bid Bond General Attachment Type of Award : Lump Sum License Requirements : Class "A" contractor's license or a combination of Class "C" specialty contractor's license(s) sufficient to perform the work Liquidated Damages : Five Hundred Dollars ($500.00) per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule Project Duration : fifty (50) working days from the date of contract execution. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/07/2021 2:00 PM (PDT) The work of improvement consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications and Contract Documents for the above stated project. The Contractor shall assume sole, complete, and continuous responsibility for stormwater runoff management and erosion/sedimentation control during construction. The Contractor shall know and fully comply with the applicable provisions of the Manuals and Federal, State, and local regulations that govern the Contractor's operations and stormwater discharges from both the project site and areas of disturbance outside the project limits during construction. The Contractor shall prepare a stormwater management plan for all associated construction activities. This plan shall include drawings showing methods for erosion and sediment control, sediment treatment control, wind erosion, vehicle and equipment tracking control, and non-stormwater waste management. The plan shall outline what measures will be used as conditions change along the alignment. The plan shall also include a description of the sequence of construction and all stormwater control procedures to be used.

Award

Water / Sewer

$657,031.00

Public - City

Site Work

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
94
Bidding Soon
2,206
All Active Projects
989
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2021

November 15, 2021

img_map_placeholder

Valley Blvd, Fontana, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.