Published July 14, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a municipal facility in San Antonio, Texas. Completed plans call for the renovation of a municipal facility.

If Bidders intend to submit bids electronically, Bidders will need to submit a request by June 29, 2023, 10:30 AM CDT to receive access to the File Transfer Protocol (FTP) site via email to Roxanne.Lockhart@saws.org. Bidders email requesting access to the FTP site shall provide the legal name of Bidders company and the intended recipients email address and phone number. No requests for FTP site access will be accepted after June 29, 2023, 10:30 AM (CDT). All bids must be accompanied by Certified or Cashiers Check or an approved Bid Bond in the amount of not less than five percent (5%) of the total bid, payable without recourse to the San Antonio Water System. Surety shall provide a copy of the Power of Attorney authorizing the Executing Agent the authority to execute the bid bond documents and bind the Surety to the bid bond conditions. The bid bond shall have a corporate Surety that is licensed to conduct business in Texas and authorized to underwrite bonds in the amount of the bid bond. Submission of an Individual Surety is not acceptable for purposes of bonding a bid bond. Bid Bonds, Certified or Cashier's checks will be retained for the first, second, and third lowest bidders until the contract is executed. The work called for in this Contract shall commence on the date indicated in the SAWS written Authorization to Proceed Under no circumstances shall the work commence prior to the date provided for in the SAWS issued, written Authorization to Proceed. Work shall be completed in full within 600 consecutive calendar days.

Bid Results

Municipal

$5,924,647.00

Public - City

Renovation

191

18

12

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Abbreviations and Acronyms, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Starting and Adjusting, Checkout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Curing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceramic Tiling, Quarry Tiling, Flooring, Resilient Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Radiant Heating Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Operation and Maintenance of Electrical Systems, Maintenance Testing of Electrical Systems, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Underground Ducts and Raceways for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Static Uninterruptible Power Supply, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Structured Cabling, Communications Horizontal Cabling, Communications Optical Fiber Horizontal Cabling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
45
Bidding Soon
1,959
All Active Projects
735
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

August 30, 2023

img_map_placeholder

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.