EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Hoffman Estates, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Village of Hoffman Estates is accepting sealed bids for the proposed work officially known as the 2021 Drainage Improvements Project, and is located at various sites in Hoffman Estates. Firms wishing to bid MUST request Authorization to Bid by filling out the designated form. For work to be constructed under the provisions of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation, current edition. The proposed improvements include, but not limited to, reinforced concrete storm sewer pipe, solid and perforated PVC pipe installations, connection to existing drainage structures, new yard inlet and catch basin, furnish new frame and grates, inlet filters, pavement patching, sidewalk, curb, regrading and sodding and related improvements not listed herein. All proposals must be accompanied by a proposal guaranty as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the "Local Roads and Streets Recurring Special Provisions. The Village of Hoffman Estates strongly encourages minority firms and women's business enterprises to apply. If subcontracts are to be let, the primary contractor shall take these same affirmative steps to solicit bids from minority and women's firms. The Village of Hoffman Estates reserves the right to reject any or all proposals and waive any informality in bidding and to accept the proposal deemed most advantageous to it, all in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the "Local Roads and Streets Recurring Special Provisions". Solid and perforated PVC pipe and RCP pipe installations, connection to existing drainage structures, new inlets, sidewalk removal and replacement, pavement patch, curb & gutter removal and replacement, regrading, sodding restoration and related improvements.

Award

Water / Sewer

$65,386.00

Public - City

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
191
Bidding Soon
2,585
All Active Projects
1,314
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2021

October 21, 2021

img_map_placeholder

Multiple Locations, Hoffman Estates, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Drainage Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.