BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to an educational facility in Seattle, Washington. Completed plans call for the construction of a 82,000-square-foot educational facility; for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The Seattle School District No. 1 (District) is soliciting qualifications and proposals from experienced firms for pre-construction and construction services for the John Rogers Elementary Replacement Project. The proposed project is located at 4030 NE 109th Street, Seattle, WA 98125, on a 9.01-acre site. The project will build a new multi-story school of approximately 82,000 sq. ft. to provide permanent space for up to 500 students, grades PreK-5. Demolition of the existing building will occur after the school year 2022-2023 is complete. Construction is anticipated to be complete prior to the 2025 academic year. Students will be located off-site during the construction period. The construction cost is anticipated to be $58 million and includes hazardous material abatement, building demolition, site work, construction of the new school and off-site improvements. John Rogers Elementary Replacement Project: The John Rogers Elementary Replacement project will be a new multi-story school of approximately 82,000 sq. ft., to provide permanent space for up to 500 students in grades PreK-5. Demolition of the existing school will occur after the school year 2022-2023. Students will be located off-site during the construction period. The construction cost is anticipated to be $58 million and includes hazardous material abatement, building demolition, site work and construction of the new school and off-site improvements. The John Rogers Elementary School project will include a photovoltaic (PV) system with the minimum size being ~21 kW in alignment with Seattle Energy Code C412. The pre-design efforts to date have included an installation of a ~500 kW PV system as a part of this project to support a Net Zero design. This Project funding includes the Seattle School District's BEX V Capital Levy, approved by Seattle voters in 2019. Lydig Construction is committed to supporting the Seattle Public Schools Strategic Plan and Board Policy 0030 related to diversity, inclusion, and educational equity.

Post-Bid

Educational

$58,000,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
34
Bidding Soon
906
All Active Projects
378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

July 1, 2022

img_map_placeholder

4030 NE 109th St, Seattle, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.