EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 18, 2021 at 8:00 PM

Updated January 25, 2024

Site work, paving and outdoor lighting for a civil project in Hilbert, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

The Village of Hilbert will receive sealed bids for the following work: Multi-Use Trail Contract No. 1126-21-02 The unconfirmed bid results will be publicly read aloud after the bid portal closes on Thursday, September 23, 2021 at 10:00 a.m. local time. A pre bid meeting will not be held. Project Description: This project includes a new multi-use recreational trail near the Village of Hilbert High School in accordance with the plans and specifications. A more detailed listing of those improvements is as follows: - Excavation, grading, installation of base course, and installation of electrical conduit. - Installation of lighting polls and electrical connections (Alternative). If a check is submitted, it must be received in Robert E. Lee & Associate's office by the posted bid date/ bid time. The Owner reserves the right to reject any or all bids or any part of a bid. Further, the Owner reserves the right to waive any informality in any bid. The Owner reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work as may be deemed necessary by the Owner; and the same shall in no way affect or make void the contract, except that the appropriate additions to or deductions from the contract price will be made. The owner encourages DBEs including MBEs and WBEs to submit bid proposals. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The letting of the work described herein is subject to the provisions of the Wisconsin State Statutes, in particular 62.15, 66.0901, and 66.0903. WDNR Permit General Permit to Impact Wetlands for Recreational Development Docket GP-NE-2021-8-00699 ACOE Permit Permit for authorization to construct the Hilbert Trail Culvert Crossing #2021-00417-JLK Substantial Completion: October 28, 2021 Final Completion and Payment: May 1, 2022

Award

Roads / Highways

$78,740.00

Public - City

Outdoor Lighting, Paving, Site Work

12

14

4

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotextiles for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
36
Bidding Soon
700
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2021

November 22, 2021

img_map_placeholder

To Be Determined, Hilbert, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.