Site work and paving for a civil project in Porter, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

All bids shall be submitted on the basis of lump sum pricing as provided in the bid specifications. Payment to successful bidder shall be net thirty (30) days after receipt of products, materials, services or invoices, whichever is later unless otherwise stated in specifications. The right is reserved, as the interest of Montgomery County Commissioners Court may require rejecting any one or all bids and to waive any informality in bids received. All bids received after the above designated closing time will be returned unopened. If the bid amount exceeds $100,000.00, a Bid Bond from an approved surety company-holding permit from the State of Texas will be required. The Bid Bond must be in the amount of five percent (5%) of the total bid amount and must accompany each bid. If applicable, the successful bidder will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the project. A prevailing wage rate has been prescribed for this project. Montgomery County is an Affirmative Action/Equal Opportunity Employer. For any questions relating to the specifications or the submission of this bid, contact Andreea Kovacs, Construction Project Coordinator by email at Andreea.kovacsmctx.org or by calling 936.539.7927 To join the pre-bid meeting via Zoom: https://us02web.zoom.usZj/85312343391 pwd=RzBORGxGbUo5QnU2aOxlOUsyZOFiUT09 Meeting ID: 853 1234 3391 Passcode: 345554 936.539.7980 FAX: 936.760.6976 vvww.mctx.org One tap mobile + 13462487799, 85312343391# US (Houston) + 16699009128, 85312343391# US (San Jose) The right is reserved, as the interest ofMontgomery County Commissioners Court may require rejecting any one or all bids and to waive any informality in bids received. All bids received after the above designated closing time will be returned unopened. Dial by your location + 1 346 248 7799 US (Houston) + 1 669 900 9128 US (San Jose) + 1 253 215 8782 US (Tacoma) + 1 301 715 8592 US (Washington DC) + 1 312 626 6799 US (Chicago) + 1 646 558 8656 US (New York) Meeting ID: 853 1234 3391

Bid Results

Roads / Highways

$9,199,612.00

Public - County

Paving, Site Work

264

17

14

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Earthwork Methods, Soil Stabilization, Soil Mixing Stabilization, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
76
Bidding Soon
2,763
All Active Projects
1,092
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2021

December 27, 2021

img_map_placeholder

Sorters Rd, Porter, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.