BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in Waco, Texas. Completed plans call for the demolition of a educational facility; for the construction of a 185,000-square-foot educational facility; and for site work for a educational facility.

https://www.fox44news.com/news/local-news/local/waco-isd-board-approves-new-building-concept-for-g-w-carver-middle-school/ Oct 29, 2021 WACO, Texas -- The Waco Independent School District Board has approved the new concept designs for a new G. W. Carver Middle School building. G.W. Carver caught fire on July 27, which gutted the majority of the building and made it impossible for staff and students to return for the beginning of the fall semester. Many speculated the school would not be rebuilt - but this is not the case. "We turned our attention to rebuilding Carver," says Superintendent Dr. Susan Kincannon. "So we've been working with our insurance providers to get an estimate on that, and we've been working with our architects on the design of a new G. W. Carver Middle School." The new building proposed is what you are seeing in the video above. It will be built where the old G.W. Carver stood, and will be an updated campus. "It was an older building built in 1956, had a lot of needs, mechanical systems, and such," Dr. Kincannon says. "It didn't have a fire suppression system. It didn't have modern security systems. So we're excited about the opportunity. Should voters approve the bond election on Tuesday." The Board met with Carver staff and alumni to talk about what pieces of history should be displayed in the new school. "Really, just talked about those special moments that they remember, and what should we capture in a new facility to honor the legacy of G.W. Carver Middle School," Dr. Kincannon said. If all goes according to plan, construction on the new G. W. Carver Middle School would start in February of next year, and they are slotted to start school at the new building in fall of 2023. _________________________________________________________ As of October 15th, 2021 this project has not been awarded. This RFP is to obtain a Construction Manager at Risk for the construction of a replacement Carver Middle School. The project will include demolition of existing facilities and construction of a new middle school and supporting athletic components. On July 27, 2021, this facility was substantially damaged by fire. Question Cutoff Date 9/21/2021 11:59:00 PM Design to Start August 2021 Anticipated Notice to Proceed Preconstruction November 9, 2021 Interviews Scheduled (if required) Tuesday, October 19, 2021 Board Meeting Date Thursday, October 28, 2021 Provide name, address and phone number of your bonding company and Agent. (Labor and Material Payment and Performance Bonds equal to 100% of the Contract Amount for Construction will be required upon submission of the Guaranteed Maximum Price.) Provide a letter from your Surety or Agent stating that your firm can provide a bond for this project based on the budget and the timeframe stated herein.

Award

Educational

$3,437,164.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
84
Bidding Soon
1,930
All Active Projects
746
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.