BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2021 at 7:00 PM

Updated October 24, 2023

Demolition, site work, paving and new construction of a civil project in Upper Saucon Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

.7009300 Replacement of Bridge No. NB-314 at Milepost A-49.67 in Lehigh County This project provides for the replacement of the existing overhead three span rolled steel I-beam bridge carrying S.R. 2027, Vera Cruz Road, over the Turnpike mainline with a two span composite prestressed concrete PA Bulb-T beam bridge. The project also includes reconstruction of SR 2027 within the limits of the bridge replacement, replacement of Turnpike median barrier and resurfacing the existing Turnpike mainline roadway. Work items include, but are not limited to: 9,737 CY Excavation, Various Classes 423 TON Subbase (No. 2A) 3,993 TON Superpave Asphalt Mixtures, Various Courses, Various Depths 15,937 SY Milling of Bituminous Pavement Surface, Various Depths 171 LF Drainage Pipes, Various Sizes 18 EA Inlets, Various Types 75 LF Guide Rail, Various Types 74 LF Concrete Glare Screen 2,160 LF Temporary Concrete Glare Screen 210 CY Class AA Cement Concrete 554 CY Class A Cement Concrete 4,269 SF Architectural Surface Treatment 252 CY Class AAAP Cement Concrete 159,281 LB Reinforcement Bars, Epoxy Coated 116 LB Stainless Steel Reinforcement Bars 1,988 LF Steel HP12x74 Production Piles 69 EA Steel HP12x74 Pile Tip Reinforcement (Normal Duty) 843 LF Prestressed Concrete PA Bulb-Tee Beams Milepost A-49.67 is located approximately 10.2 miles south of the Lehigh Valley Interchange, Exit 56, and is located approximately 5.6 miles north of the Quakertown Interchange, Exit 44, in Lehigh County, Pennsylvania. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. Any questions for this project must be submitted electronically Estimated Cost Range: $1-5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$4,703,591.00

Public - State/Provincial

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
851
Active Projects
358
Bidding Soon
5,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2021

December 20, 2021

Project location map

Vera Cruz Rd, Upper Saucon Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.