BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in El Paso, Texas. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

*A construction manager has been awarded. Construction is scheduled to begin in May 2022. The project consists of the demolition/renovation of the Riverside High School CTE Building, the Demolition and Construction of a New Clinic Building, and Misc. Renovation work to other existing buildings at Riverside High School for YISD. This project will be split into Phases: Phase 1 – Demolition Phase 2 – Roofing Phase 3 – Steel Phase 4 – Buildings C & D Phase 4 – Building A RTU Package Phase 5 – Building A Phase 6 – Building B Last day for questions/clarifications 9/16/2021 11:55:00 PM (MT) Submit all questions through the E-bid system. Any Questions submitted through email will not be considered. Posting of Questions/Answers 9/17/2021 5:00:00 PM (MT) Published through the E-bid system The goal is to renovate the existing building "A" by replacing existing evaporative air conditioning systems with new refrigerated system. Renovate existing building "B" with cosmetic finishes, demolish building "C" and provide a new building "C" on Vocational Drive and remodel existing building "D". The project is to be constructed in three phases. The scope related to the CTE Building includes, but not limited to the following: Design new CTE building to house the following programs: a. Architecture and Engineering b. Cosmetology c. Culinary Arts d. Real Estate e. Design is to include the support spaces needed to accommodate all system functions of the building Payment and performance bonds for 100% of the amount of the Anticipated Construction Budget as specified herein will be required upon execution of owner/construction manager agreement. Include a letter of intent from the named surety company indicating your firm's ability to bond for 100% of the Anticipated Construction Budget. YISD reserves the right to make changes to any of these published documents and amendments prior to execution of any agreement.

Award

Educational

$22,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
248
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.