BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Greencastle, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Owner Office Crawfordsville Dist / Capital Program Mgmt Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 9.2% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 Prequalification Required: Yes Project Development Services - Bridge Replace Superstructure, I-70 EB and WB over Vermillion Creek in Putnam County The selected firm will perform the design and plan development work necessary to produce the construction contract documents. The selected firm will be required to provide Environmental Documentation, all Permits, Topographic Survey, Geotechnical Investigation, Pavement Design, Utility Coordination, Design and Plans including Right-of-Way plan development/Title Research, and Construction Phase Services. A traffic management plan is required. Additional services may also be required, such as Wetland Mitigation, Archaeological Investigations and/or Historical/Architectural Investigations. The selected consultants fee proposal shall be due 45 calendar days after the selection date for this RFP item. These contracts will utilize the INDOT eInvoice application. 2100971 - I 70, Replace Superstructure, EB over Vermillion Creek, 4.57 mi E of US 231, in Putnam Co. RP 045+075 to RP 045+076 - $3,080,000.00 2100972 - I 70, Replace Superstructure, WB over Vermillion Creek, 4.57 mi E of US 231, in Putnam Co. RP 045+076 to RP 045+077 - $3,410,000.00 As of November 1, 2022, the project is included in the Indiana Department of Transportation State Preservation and Local Initiated Projects FY 2022-2026. Further details regarding design and construction timelines have not been identified. INDOT - RFP - On Call Hydraulic Services

Conceptual

Bridges / Tunnels

$6,490,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
52
Bidding Soon
739
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

I-70, Greencastle, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.