BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Emporia, Kansas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project consists of removal of existing deck and partial abutment backwalls, installing shear studs on existing steel beams, reconstructing abutment backwalls, replacing bridge deck and rails and constructing approach pavement. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Brady Hedstrom, P.E. Project Engineer brady.hedstrom@bgcons.com

Award

Bridges / Tunnels

$615,023.00

Public - County

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
65
Bidding Soon
736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2021

January 15, 2022

Project location map

Multiple Locations, Emporia, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.