BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a civil project in Golden Valley, Minnesota. Completed plans call for site work for a water / sewer project; for the demolition of a water / sewer project; and for the construction of a water / sewer project.

The City of Golden Valley reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Golden Valley. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. The Project includes the furnishing of all labor and materials for the construction complete in-place, that includes but is not limited to the following: A. Removal of existing lift station building and underground structures. B. Removal of existing lift station equipment and piping. C. Removal of existing bituminous driveway and retention wall. D. Removal and abandonment of selected sanitary sewer manholes and sewer mains. E. Furnish and install sanitary sewer manholes. F. Furnish and install precast wet well and valve vault structures. G. Furnish and install new submersible pumps, piping, and valves. H. Furnish and install new open-channel grinder. I. Furnish and apply lift station coatings. J. Install new control panel and controls. K. Furnish and install 6" HDPE forcemain with directional drilling. L. Furnish and install SCADA antenna and light pole. M. Bituminous driveway, concrete pad, miscellaneous site work, and landscaping. N. Removal and disposal of contaminated soils.

Award

Water / Sewer

$894,512.00

Public - City

Demolition, New Construction, Site Work

47

22

10

8

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
48
Bidding Soon
806
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

5000 Olson Memorial Highway, Golden Valley, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.