Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a civil project in Golden Valley, Minnesota. Completed plans call for site work for a water / sewer project; for the demolition of a water / sewer project; and for the construction of a water / sewer project.
The City of Golden Valley reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Golden Valley. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. The Project includes the furnishing of all labor and materials for the construction complete in-place, that includes but is not limited to the following: A. Removal of existing lift station building and underground structures. B. Removal of existing lift station equipment and piping. C. Removal of existing bituminous driveway and retention wall. D. Removal and abandonment of selected sanitary sewer manholes and sewer mains. E. Furnish and install sanitary sewer manholes. F. Furnish and install precast wet well and valve vault structures. G. Furnish and install new submersible pumps, piping, and valves. H. Furnish and install new open-channel grinder. I. Furnish and apply lift station coatings. J. Install new control panel and controls. K. Furnish and install 6" HDPE forcemain with directional drilling. L. Furnish and install SCADA antenna and light pole. M. Bituminous driveway, concrete pad, miscellaneous site work, and landscaping. N. Removal and disposal of contaminated soils.
Award
Water / Sewer
$894,512.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
April 1, 2024
5000 Olson Memorial Highway, Golden Valley, MN
Related To This Project
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
Bid Date: Dec 12 2022
Golden Valley, MN
Bid Date: Nov 17 2022
Golden Valley, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.