BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Bjorkdale, Saskatchewan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The existing 5-Span bridge located downstream from Barrier Lake ( Approximatly 1.5 km ) and over the Barrier River has reached its service life and is needing to be replaced. This bridge is referred to by the RM of Bjorkdale as the Hamel Bridge. Items of work to be completed within this contract are as follows: Traffic Accommodation and traffic signs at the bridge site only Dismantling of the existing bridge Removal and disposal of existing surfacing Disposal of unsalvagable treated timber Hauling and Stockpiling of salvageable treated timber to nearby yard Disposal of existing bridge materials Excavating of the existing roadway approach embankment to form the abutment, spill-through slopes, and to facilitate the construction of the abutments Supply and Construction of all substructure components Placement of granular filter blanket and riprap slope protection Supplying, hauling, placing, and compacting granular backfill material and earth backfill material behind both abutment backalls as identified on the Plans Erection of precast prestressed concrete stringers Preparing the road for surfacing on the completed bridge and approaches Installation of side mounted Type 4 Steel Bridgerails Installation of collapsible hazard markers Miscellaneous construction activities identified on the Plans and in the Special Provisions Proposals must also be accompanied by a Bid Bond or Certified Cheque in the amount of not less than 5% of the Total Bid Amount payable to the Rural Municipality of Bjorkdale No. 426. Should your bid be accepted by the RM, the Undersigned Bidder agrees to furnish the Performance Bond, the Labour & Material Payment Bond, and the Proof of Insurance pursuant to subsections 1200.10 and 1200.11 of the General Provisions. Contractors are requested to refer all questions by email to: rm426@sasktel.net

Post-Bid

Bridges / Tunnels

$500,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
12
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

November 1, 2022

img_map_placeholder

Multiple Locations, Bjorkdale, SK


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.