BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Lakeland Village, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of December 3, 2021, the project has not been awarded yet. A timeline for award has not yet been established. This project's goal is to capture storm flows near the hills located southwesterly of Lake Elsinore and convey them safely through an underground storm drain system within existing streets to the Lake Elsinore outlet at the northerly end of Maiden Lane. The project consists of 7,177 ft of underground storm drain facility Lakeland Village Line H, its associated laterals Line H-1 and Line H-2 and their associated appurtenant structures such as manholes, catch basins, and connector pipes. Construction will also consist of an energy dissipation outlet structure, three flow collection areas including grading, riprap placement and concrete headwall construction. A sediment/debris basin will also be constructed to benefit Lake Elsinore's water quality. The project also includes street rehabilitation for the portions of the streets that will be affected by the construction of the storm drain as well as the conversion of the existing unpaved portion of Maiden Lane between Cottrell Boulevard and the sediment basin to an asphalt road with rolled gutter. The District will design and construct the facility to eliminate approximately 40 acres of floodplain affecting residential and commercial properties and various streets within the Lakeland Village community. Bid Bond Percentage: 10% Project Duration: 400 Work Days Liquidated Damages: $1,600.00 Per Work Day License Type Required: Class "A" Contractors If the Performance Bond provides for a one-year warranty, a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year, a Maintenance Bond equal to ten percent (10%) of the contract price is required.

Award

Water / Sewer

$13,145,131.00

Public - County

Paving, Site Work

290

12

8

11

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
547
Active Projects
254
Bidding Soon
4,044
All Active Projects
1,840
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 20, 2021

December 20, 2021

img_map_placeholder

Maiden Ln, Lakeland Village, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.