Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Gwynedd, Pennsylvania. Completed plans call for site work for a water / sewer project.
For a contractor to remove and replace an underground tank as requested by the DPW. The contractor's tank removal responsibilities include: -Removal and disposal of existing concrete island and tank pads -The cleaning, removal, and disposal of a 6000-gallon single wall fiberglass tank and 4000-gallon double-wall steel buffhide tank, with associated piping removed too. -Preforming a PA DEP Tank Closure assessment with required soil samples. -Excavation of the existing tank hole to prepare for the new tank For the new tank, the contractor's responsibilities include The Supply and installation of the following: -10000- gallon double wall fiberglass tank, split 5k/5k with brine interstitial space - 2 observation wells and manholes - 350 tons of 1b stone - 2 fills with containment/overfill - 2 probe risers - 2 tank subs and mounting kits - interstitial riser, cap and adaptor - 2 vent lines - dry break - 2 double-wall suction lines - 2 dispenser sumps - fuel island 4' x 6' x 13" carbon steel- 3 U-shaped bollards Furthermore, the reinstallation of existing pumps & fuel management system (including calibrations, wet test and sealing of said pumps) The Supply & installation of conduit wiring to the following: - 2 fuel pumps - 2 dispenser sump sensors - island light - fuel management system - 2 tank sumps - interstitial sensor at tank - 2 probes - overfill alarm - 1 phone (provided by owner) - 24-circut sub panel with breakers - Emergency Stop Sign at Wall Forming and pouring of concrete for 1 tank pad, 1 fuel island, 1 lighting footing, and a 12' x 25' x 8" drive mat. (Note all concrete to be 4000 psi with fibermesh) The Supply and Installation of the following - 4 Veeder Root sump sensors - Veeder Root interstitial sensor - Veeder Root 8' Probes, caps, and adaptors - 4 Veeder Root mounting kits All areas disturbed by construction activity must be landscaped all bollards, fuel islands, and manholes must be primed and painted Clarification Deadline: 9/24/2021 2:00 PM ITEM #l To prepare 30-day PADEP Closure Notification. ITEM #2 To notify PA One Call to have utilities located and marked. ITEM #3 To secure local removal permit. ITEM #4 To remove and set aside for reuse, existing fuel management system. ITEM #5 To remove and dispose of concrete island and tank pads. ITEM #6 To clean, remove, and dispose of 1-6,000-gallon single-wall fiberglass tank, and 1-4,000-gallon double-wall steel buffhide tank with associated piping. ITEM #7 To perform 1- PADEP Closure Assessment with required soil samples. ITEM #8 To provide owner with PADEP Tank Closure Report. ITEM #9 To secure PA State installation permit. ITEM #10 To excavate existing tank hole and prepare for new tanks. ITEM #11 To supply and install the following: 1 - 10,000-gallon double-wall fiberglass tank, split 5k/5k with brine interstitial space; 2 - observation wells and manholes; 350 tons 1B stone; 2 - fills with containment/overfill; 2 - probe risers; 2 - tank sumps and mounting kits; 1 - interstitial riser, cap and adaptor; 2 - vent lines; 1- dry break; 2 - double-wall suction lines; All manholes and tank fittings; 2 - dispenser sumps; 1-fuel island 4' >< 16' x 13" carbon steel; 1- island light 16' high with 2 - fixtures; and 3 - U-shaped bollards. ITEM #12 To reinstall existing pumps and fuel management system. TEM #13 To start up system, wet test, calibrate, and seal pumps. ELECTRICAL ITEM #14 To supply and install conduit and wiring to the following: 2 - fuel pumps; 2 - dispenser sump sensors; 1 - island light; 1-fuel management system; 2 - tank sumps; 1 - interstitial sensor at tank; 2 - probes; 1 - overfill alarm; 1 - phone (NOTE: Phone provided by owner); 1- 24-circuit sub panel with breakers; and 1- Emergency stop with sign at wall. ITEM #15 To make all connections inside and outside. CONCRETE ITEM #16 To form and pour the following: 1-tank pad; 1 - fuel island; 1- lighting footing; and 1 -12' x 25' x 811 drive mat. NOTE: All concrete to be 4,000 psi with fibermesh. ASPHALT No asphalt in our proposal. VEEDER ROOT CONSOLE ITEM #17 To supply and install the following: 4 - Veeder Root sump sensors; 1 - Veeder Root interstitial sensor; 2 - Veeder Root 8' probes, caps, and adaptors; and 4 - Veeder Root mounting kits. ITEM #18 To reprogram Veeder Root console for new equipment. LANDSCAPING ITEM #19 To landscape area disturbed during construction activity. PAINTING ITEM #20 To primer and paint bollards, fuel island, and all manholes at tank field. TESTING ITEM #21 To perform compliance testing upon completion of project. TANK REGISTRATION ITEM #22 To complete and submit Amended Tank Registration.
Award
Water / Sewer
$240,198.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2021
November 1, 2021
To Be Determined, Gwynedd, PA
Related To This Project
Gwynedd, PA
Bid Date: Jan 12 2022
Gwynedd, PA
Bid Date: Feb 14 2024
Gwynedd, PA
Bid Date: Nov 03 2021
Gwynedd, PA
--
Gwynedd, PA
Bid Date: Feb 26 2024
Gwynedd, PA
Bid Date: Apr 25 2024
Gwynedd, PA
Bid Date: Jun 07 2024
Gwynedd, PA
Bid Date: Jun 20 2024
Gwynedd, PA
--
Gwynedd, PA
Bid Date: Feb 13 2020
Gwynedd, PA
Bid Date: Sep 30 2020
Gwynedd, PA
Bid Date: Mar 15 2023
Gwynedd, PA
Bid Date: Jun 28 2022
Gwynedd, PA
Bid Date: Oct 04 2022
Gwynedd, PA
Bid Date: Oct 04 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.