BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Downey, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 22, 2022 , this project has not yet been awarded. The project is expected to be awarded on April 26, 2022.** The work to be performed under this Contract generally consists of pavement rehabilitation of Fifth Street, between Brookshire Avenue and Lakewood Boulevard including three cul de sacs within the project limits, as shown on the Plan. This project includes reconstruction of failed pavement areas, cold milling of asphalt pavement; construction of asphalt concrete (AC) base course and asphalt rubber hot mix (ARHM) overlay. Work also includes installation of missing curb, gutter and sidewalk along the west side of Birchdale Avenue, entrance to Downey High School, as well as repair of uplifted, damaged or substandard concrete curb, gutter, sidewalk, driveway, and curb ramps; adjustments of manhole and utility valve covers to the new grade, replacement of traffic striping, pavement markings and signings; traffic control and all appurtenant work. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000.00/Calendar Day Pre-Bid Meeting No Online Q&A No Project Duration 40 Working Days

Award

Roads / Highways

$584,000.00

Public - City

Paving, Site Work

5

9

7

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
268
Bidding Soon
3,462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 6, 2022

Project location map

5th St, Downey, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.