BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2021 at 8:00 PM

Updated June 4, 2025

Site work and paving for a civil project in Conroe, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project scope shall include the installation of approximately 2,700 LF of 6"-8" PVC water line; 2,560 LF of 8" PVC sanitary sewer; 1,300 LF of 24"-42" RCP storm sewer; and 8,680 SY of 6" reinforced concrete pavement. Bid Opening Meeting ID: 846 4680 0988 Passcode: 283446 Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project SCOPE OF WORK: a. Contractor shall commence and complete the Work generally described as follows: Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to serve Chambers Creek, Section Three for Montgomery County Municipal Utility District No. 100, Montgomery County, Texas, according to those particular Plans and Technical Specifications prepared by Edminster, Hinshaw, Russ & Associates, Inc. d/b/a EHRA ("Engineer") and all Extra Work in connection therewith, under the terms as stated in the Contract, and, at Contractor's own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents, including, the Invitation to Bidders, Instructions to Bidders, Contractor's Bid, the Contract, Plans, and other drawings and printed or written explanatory matter thereof, and the Technical Specifications, on file with Engineer. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all other Contract Documents, which are made a part of the Contract, and is thoroughly familiar therewith. Under this Contract and the Contract Documents, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in the Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. c. The Work, in general, under the Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. d. Major items of construction and services required are designated as follows: i. Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances ii. Construct and adjust sanitary sewer, manholes, and appurtenances iv. Furnish and install all subsidiary items as necessary to complete the project v. Perform testing as specified on installed lines vi. Clean-up project area upon completion TIME FOR COMPLETION: a. The Contractor hereby agrees to begin work within 5 calendar days after Engineer has given written Notice to Proceed. Contractor hereby also agrees to achieve Substantial Completion of the Work within sixty (60) calendar days after the date of the written Notice to Proceed.

Bid Results

Water / Sewer

$1,434,148.00

Public - County

Paving, Site Work

22

16

26

7

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
201
Bidding Soon
3,346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2021

November 15, 2021

Project location map

To Be Determined, Conroe, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.