BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Mansfield, Texas. Completed plans call for site work for a road / highway.

It was discovered from a recent electromagnetic inspection that 45 pre-stressing wires are broken on Pipe ID 70173 in Section 2 of the Cedar Creek pipeline under Cagle Crow Road. The Cedar Creek pipeline is a 72" diameter pre-stressed concrete cylinder pipe (PCCP). After a structural evaluation it was determined that this pipe should be repaired within a very short time to mitigate risk of failure. In addition, the location of this segment under the road increases the consequence of failure. TRWD intends to install one 24' area of Carbon Fiber-Reinforced Polymer (CFRP) lining to ensure reliability of the 72" pipeline, including two equivalent 72" expansion rings at the joints. This work includes furnishing labor, all materials, tools, equipment, transportation, storage, and supervision required for the design, supply, and installation of internally bonded CFRP, including protective coatings, to rehabilitate this location of PCCP on the Cedar Creek pipeline. Questions are to be submitted using the Question and Answer process on the Procurement Website. Response to questions posted on the Procurement Website will be posted on the website by the District for the benefit of all bidders. A response will be given for questions submitted by end of day October 04, 2021. To comply with current COVID-19 declarations and to comply with social distancing guidelines, the Tarrant Regional Water District Purchasing Department has suspended in person public bid/proposal openings. Effective immediately, the proposal opening for this project on October 21, 2021, will be available only through live stream on the following website: https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetupjoin%2F19%3Ameeting_Nzk2OWU0ODQtOGUyYS00YTQyLTg2ZmEtZGIxYzgxYTE3NDQ2%40t hread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522c9de0af1-361b-42ae-ace3- ab4cea6cb8dc%2522%252c%2522Oid%2522%253a%25229079376c-7d66-4095-a4c1- 94093d887b6f%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=a9be32da-732b4ba8-afa7- ea7cd3ac8071&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Bid Results

Roads / Highways

$163,150.00

Public - County

Site Work

10

11

4

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
77
Bidding Soon
3,605
All Active Projects
1,314
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2021

December 3, 2021

img_map_placeholder

Cagle Crow Rd, Mansfield, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.