Published January 27, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a civil project in Elkton, South Dakota. Completed plans call for site work for a road / highway.

The major elements associated with the Utility Improvements - Phase II project are: Bid Schedule A: Approximately 2,990 tons of furnished base course, 8,940 tons of salvaged base course, 5,670 tons of asphalt, 3,200 linear feet of eight-inch water main, 2,230 linear feet of six-inch water main, 74 water service lines, 1,400 linear feet of 10-inch sewer main, 4,710 linear feet of eight-inch sewer main, 17 sanitary sewer manholes, 111 sanitary sewer services, 1,590 linear feet of four-inch service line, 220 linear feet of six-inch service line, 800 linear feet of 12-inch culverts, and all related appurtenances to the aforementioned work. Alternate A: Approximately 200 tons of furnished base course, 110 tons of asphalt, 460 square yards of geotextile fabric, 160 yards of unclassified excavation, and 4 bollards. The approximate quantities mentioned above are subject to increase or decrease. It will be agreed by bidders that all quantities of work will be performed in accordance with the provisions of the specifications and at the unit price bid. Bidders agree to furnish all labor, material, and equipment necessary to complete all the work as shown in the plans and specifications. Each bid must be accompanied by a certified check or bank draft payable to the order of the City of Elkton, South Dakota, in an amount equal to five percent (5%) of the total bid. A bid bond in an amount equal to ten percent (10%) of the total bid will be accepted in lieu of a certified check or bank draft. Surety for bid bond must be authorized to do business in the State of South Dakota. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The goal for Minority-Owned Business Enterprise (MBE) on this project is one percent (1%) and the goal for Woman-Owned Business Enterprise (WBE) on this project is four percent (4%). The goals and other requirements for bidders and contractors under this regulation which concerns utilization of disadvantaged/minority business enterprises are explained in the Contract Documents. Bids may be held by the City Council for a period of not more than thirty (30) days from the date of opening of bids for the purpose of reviewing the bids, investigating the qualifications of the bidders and completing financial arrangements prior to awarding the Work. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding and make awards to the Owner's best interest.

Award

Roads / Highways

$3,355,376.00

Public - City

Site Work

171

21

11

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Hooks, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
11
Bidding Soon
150
All Active Projects
72
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2021

November 12, 2021

img_map_placeholder

Multiple Locations, Elkton, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.