BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Waunakee, Wisconsin. Completed plans call for site work for a playground / park / athletic field.

The complete form shall be without alterations, additions, or erasures. All proposals shall be on a lump sum basis. A 5% bid bond is required. The owner reserves the right to reject any or all proposals and to waive any irregularities in the proposals. Questions regarding the project should be directed to Fred Kolkmann at courtbuilder@ameritech.net / 1-262-685-7507. Project is to be started and completed between May 1st, 2022 and September 15, 2022. Install access road from parking lot to tennis court. Any damage to the existing parking lot or approach will be bid on a square yard basis to repair/replace and is not part of the base bid. Install erosion control around perimeter. Remove existing fence fabric and posts, basketball posts and backfill holes with 3/4" TB, Pulverize existing asphalt and base. Install drain tile around perimeter to elevations shown. Install rock at drain tile exit. Install 3/4" TB to new elevations. Verify elevations of stone grade. Pave with a 2" lift of asphalt binder. Install net post and center tie down footings, pave a 1 1/2" lift of surface course (virgin asphalt). Core 3" holes around perimeter and drive 3" SS-40 (black vinyl) 8' high fence posts 5' deep on maximum 8' spacing. Install top and bottom rail, install fence fabric and gates. Behind new bang board location install 10' high posts on 4' centers in concrete. Install 8' high fabric behind bang board. After a 28 day cure, cut control joints and install Armor over joints. If paving contractor used set down or closure passes, those cold joints to also be covered with Armor, Install First Team Basketball goals on south end and re-install Bakko Bang Board on north end. Apply a 2 coat black NuSurf and a 2 coat Colorflex (Dark green interior, light green exterior) color. Paint also around outside of fence. Stripe with white lines for tennis and basketball. Landscape around perimeter and clean up Site

Post-Bid

Playgrounds / Parks / Athletic Fields

$490,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
53
Bidding Soon
823
All Active Projects
378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

May 1, 2022

img_map_placeholder

1415 Tierney Dr, Waunakee, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.