Site work for a water / sewer project in Tempe, Arizona. Completed plans call for site work for a water / sewer project.

The Proposed Work Will Consist of the Rehabilitation of 4.4k Linear Feet of Sanitary Sewer Pipe and (82) Sanitary Sewer Access Manholes, Together With Associated Work. Please direct any questions no later than August 10, 2021 by 5:00 p.m., Arizona time, to the City of Tempe Engineering Division Procurement Officer, Wendy Springborn at wendy_springborn@tempe.gov. The proposed work will consist of installing Cured-In-Place (CIPP) liner into existing sewer pipe, epoxy coat access manholes; install new 48-inch and 60-inch diameter manholes; remove and replace sewer pipe; install CIPP patches and install lateral seal connections. Work also includes provided post rehabilitation/replacement CCTV documentation. The project includes (22) pipe segments and (82) manhole locations within the City of Tempe, together with associated work. All construction shall be provided in accordance with the requirements of the 2021 Revision to the 2020 Maricopa Association of Government (MAG) and the 2014 City of Tempe Supplement to MAG Uniform Standard Specifications and Details for Public Works Construction. The Contractor shall provide all materials, equipment, and labor necessary to rehabilitate / replace sanitary sewer pipes and access manholes utilizing epoxy coating technologies, composite inserts, Cured-In-Place-Pipe (CIPP) liner, and/or open cut replacement/installation methods according to project design drawings and/or technical specifications. Major work to be performed under this contract includes, but is not limited to the following: 1. Provide all traffic control on streets, alleys and driveways during construction as necessary for sanitary sewer pipe rehabilitation, access manhole rehabilitation and bypass operations. Traffic control plans shall be submitted to the City for approval prior to construction activities. 2. Restore area disturbed by construction activities back to pre-construction conditions. 3. Provide coordination with the City for public notification of construction activities to the general public. 4. Provide all bypass pumping, piping, power, noise control, and odor control including materials, labor and equipment necessary to divert sanitary sewage flows around the rehabilitation construction area as necessary to complete the work. 5. Coordinate work activities with adjacent businesses, public events and special needs i.e. medical and emergency response. 6. Maintain access to private properties including sidewalks and driveways as necessary during the course of the work. Maintain sanitary sewer service to properties as necessary to prevent sewage backups into homes and businesses. 7. Perform initial cleaning of sanitary sewer pipe to remove all metallic pipe tuberculation, grease, scale, roots, debris, and foreign protrusions prior to pipe rehabilitation. 8. Provide all equipment, labor, materials required to install Fiber Reinforce Polymer mesh around sewer pipe spanning through storm drain pipe. 9. Perform "pre" pipe rehabilitation analog CCTV and "post" pipe rehabilitation digital panorama CCTV condition documentation. 10. Provide all equipment, labor, and materials required to install CIPP liner and CIPP patch into sanitary sewer pipes as indicated in the design drawings and technical specifications. 11. Provide all necessary equipment to prevent construction debris from entering sanitary sewer system. 12. Perform initial cleaning of sanitary sewer access manhole to remove debris, and foreign protrusions prior to manhole rehabilitation. 13. Provide all equipment, labor, and materials required to install structural manhole inserts as indicated in the design drawings and technical specifications. 14. Provide all equipment, labor, and materials required to coat access manholes as indicated in the design drawings and technical specifications. 15. Provide all necessary equipment to prevent construction debris from entering sanitary sewer system. 16. Provide all equipment, labor, and materials required to coat access manholes as indicated in the design drawings and technical specifications. 17. Provide all equipment, labor, and materials required to install 11600 Series Triplex(TM) Liner System. 18. Provide "post" rehabilitation panorama digital scan of manholes to document asbuilt conditions. 19. Restore the construction sites to pre-existing conditions.

Award

Water / Sewer

$2,256,655.00

Public - City

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
39
Bidding Soon
979
All Active Projects
418
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.