BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Frisco, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Questions must be received by to 2 pm, Friday, June 10, 2022. Questions received after this time will not be answered. WORK MUST BE COMPLETE IN FULL BY: i. BASE BID A: SEPTEMBER 1, 2023, LEGACY DRIVE ii. BASE BID B: DECEMBER 1, 2023, FIELDS PARKWAY. Liquidated damages are set at an amount equal to 5,000.00 per Calendar Day for the first thirty (30) Days of delay, an amount equal to $10,000.00 per, Calendar Day for the next thirty (30) Days of delay (Days 31-60), and an amount equal to $25,000.00 per Calendar Day for the each and every Day of delay thereafter (Days 61 and beyond) following the expiration of the applicable Contract Time for each Base Bid of the Work. The Project includes two Base Bids for the Work: Base Bid A: Legacy Drive between Panther Creek Parkway and PGA Parkway includes the following; This Project includes the grading, paving, 12’ hike & bike trail, storm drain including inlets, conspans, box culverts, and headwalls, an approximate 665 linear foot bridge over Panther Creek, traffic signals modification at PGA Parkway and Panther Creek Parkway, traffic signal at Fields Parkway, pedestrian tunnel, signing, pavement markings, 20” water line, 27” wastewater line, street lighting, multi-duct conduit, and median landscaping and irrigation. The Owner has pre-purchased specimen trees for the project and the contractor shall provide all necessary coordination for installation timing to meet schedule requirements. The quantities provided are estimates. The bid form unit pricing will prevail, based on actual quantities. This scope of Work will require a separate bid for accounting purposes. Base Bid B: Fields Parkway between Teel Parkway and the new Legacy Drive includes the following; This Project grading, paving, 12’ hike & bike trail, two roundabouts between Teel Parkway and Legacy Drive, storm drain including inlets, conspans, box culverts, and headwalls, traffic signals at Dallas Parkway, two pedestrian tunnels, signing, pavement markings, 24” water line, street lighting, multi-duct conduit, and median landscaping and irrigation. The Owner has pre-purchased specimen trees for the project and the contractor shall provide all necessary coordination for installation timing to meet schedule requirements. The quantities provided are estimates and the bid form unit pricing will prevail, based on actual quantities. This scope of Work will require a separate bid for accounting purposes.

Award

Roads / Highways

$105,775,722.00

Public - City

Paving, Site Work

1060

23

8

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
66
Bidding Soon
3,515
All Active Projects
1,397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.