Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 20, 2021 at 7:00 PM
Updated October 24, 2023
Renovation of an educational facility in Muskegon, Michigan. Completed plans call for the renovation of a 170,000-square-foot educational facility.
High School HVAC Upgrades Replace the existing HVAC system in the 170,000 SF High School. There will be associated architectural work and a new roof to be installed. Bid package #5 Work will begin late winter 2022 and continue through the summer of 2023. This project will be conducted in phases. The boiler room will be from February 2022 to August 2022. Phase 1A will be from June 2022 to August 2022. Phase 1B will be from June 2022 to December 2022. Phase 2A will be from January 2023 to August 2023. And Phase 2B will be from June 2023 to August 2023. The areas of each phase can be found in the Project Manual. Duplicate proposals shall be submitted to the Construction Manager at the above address on the proposal form provided, in a sealed envelope clearly marked WORK CATEGORY NO. _________, and shall be identified with the project name and the bidder's name and address. All contractors bidding on work must be bondable and must include in their bid the cost for furnishing a Co-Obligee Labor and Material Payment Bond and a Co-Obligee Performance Bond. On the proposal form, the contractor will identify a cost to be deducted from their bid should bonds not be required. Due to current regulations limiting indoor gathers, in lieu of a formal prebid meeting building tours will be made available and can be scheduled directly with Pat Zawacki. To schedule a time, Pat can be reached at pat.zawacki@christmanco.com or 616-454-4454. It is strongly recommended that contractors with associated work in the building demolition tour the building. Contract documents will be distributed through Procore and may be obtained Tuesday, November 30, 2021, by contacting Josh Duffy with The Christman Company at josh.duffy@christmanco.com or 616-915-9585 All questions are to be directed to the Construction Manager. No direct contact with the Owner or Architect is requested. Each Proposal shall be accompanied by a certified check, cashiers' check, money order, or bid bond made payable to The Christman Company in an amount not less than five percent (5%) of the base bid security. The Bid Security of Bidders under consideration will be returned immediately after the award of contracts by the Construction Manager. The amount of the guarantee shall be forfeited to the Owner if the successful bidder fails to enter into a contract and furnish required bonds and insurance within 30 days after award of contracts. Each Proposal shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Board or the Superintendent of the school district. Bidders must certify that they are not an "Iran-linked" business. All proposals submitted shall remain valid for a period of sixty (60) days after the bid date. The Owner, Architect and Construction Manager reserve the right to waive any irregularities, reject any or all proposals, or accept any proposal, which, in their opinion, will serve their best interest. The Christman Company looks forward to the opportunity to work with your project team. Addendum 1 has been released. This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the Bid Form. Failure to do so may result in disqualification of the Bid.
Post-Bid
Educational
$4,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2021
February 21, 2022
80 W Southern Ave, Muskegon, MI
Related To This Project
Muskegon, MI
Bid Date: May 26 2022
Muskegon, MI
Bid Date: May 24 2022
Muskegon, MI
Bid Date: Mar 01 2022
Muskegon, MI
Bid Date: Jun 01 2022
Muskegon, MI
Bid Date: Jan 21 2020
Muskegon, MI
Bid Date: Oct 27 2020
Muskegon, MI
Bid Date: Dec 03 2019
Muskegon, MI
Bid Date: Jan 31 2019
Muskegon, MI
Bid Date: Apr 19 2022
Muskegon, MI
Bid Date: Mar 22 2022
Muskegon, MI
Bid Date: Apr 05 2022
Muskegon, MI
--
Muskegon, MI
--
Muskegon, MI
Bid Date: Mar 30 2022
Muskegon, MI
Bid Date: Mar 18 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
