BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and renovation of a mixed-use development in Lagrange, Georgia. Completed plans call for the demolition of a fitness / recreation center; for the construction of a fitness / recreation center; for the renovation of a fitness / recreation center; for site work for a fitness / recreation center; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 10,2023, The project is completed and ready for occupancy. **The owner has selected a Construction Manager. A timeline for construction has not yet been established** The Troup County Board of Commissioners LaGrange, GA (Owner) is requesting proposals for the services of a Construction Management Firm (CM). In addition to managing the construction, the CM will provide pre-construction services and work collaboratively with Troup County 's Architect, Smith Design Group, Inc., to develop potential cost savings, safety plans and schedules in relation to these proposed enhancements. The CM firm will issue a guaranteed maximum price for PHASE 1 after completion of pre-construction services and, if accepted by the Owner, will assume responsibility for project construction. The GMP will be a contractual obligation. The CM will also develop an overall project schedule, which will be a contractual obligation. In addition, the CM will be responsible for methods of construction, bonding the project, safety, and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its predetermined budget and scheduling. The CM firm will issue a proposed detailed construction budget for PHASE 2 and PHASE 3 of the project at completion of pre-construction services. There is a possibility that additional funds for PHASE 2 and/or PHASE 3 may become available during construction of PHASE 1. The Owner reserves the right to enter into a GMP contract with the CM firm for PHASE 2 and/or PHASE 3, if additional funds become available

Occupancy

Fitness / Rec Centers

$3,500,000.00

Public - County

Demolition, New Construction, Paving, Renovation, Site Work

90

19

2

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
56
Bidding Soon
1,316
All Active Projects
489
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2021

April 7, 2022

img_map_placeholder

716 Glenn Robertson Dr, Lagrange, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.