Published August 17, 2022 at 8:00 PM

Updated September 14, 2023

Demolition and site work for a power facility in Glendale, California. Working plans call for the demolition of a power facility; and for site work for a power facility.

**As of August 17, 2022, bids was rejected. No definite date for the rebid.** Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in the Project Drawings and Specifications and will generally include: o Separation of Grayson Unit 9 from other plant services that will be demolished, and replacement with alternate services such that Unit 9 can operate independently during the demolition and construction phases of the repowering project. o Separation of Grayson Units 1-8, which are to be demolished, from plant utilities so that the units can be safely demolished and the utilities can continue to serve Unit 9. o Relocation of plant utilities that must remain during demolition and construction but must be relocated out of the areas to be demolished. The Work will be performed in three phases: o Phase 1 - All Work that can be done while all of the units remain in operation as well as all pre-work for Phase 2. o Phase 2 - All of the units, including Unit 9 will be shut down. Because all units will be shut down, this Work must be completed within a two-week time period. After Phase 2, only Unit 9 will be capable of operation. o Phase 3 - Completion of any remaining Work. Such Work cannot impact the operability of Unit 9. Completion of Phase 3 is a prerequisite to the start of demolition which is the subject of a different Request for Proposals. An estimate of the preliminary cost of this Work has been prepared. The estimate is in the range of $3,500,000 to $4,500,000. Pre-Qualification for Bidders: Not Required Project Duration: 90 Calendar Days Liquidated Damages: $3,000.00 Per Calendar Day Bid Bond Percentage: 10% The estimate is in the range of $3,500,000 to $4,500,000 The Bidder Question Submittal Deadline date has been changed to June 6, 2022 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Thermal Power Generation

$4,247,507.00

Public - City

Demolition, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
533
Active Projects
268
Bidding Soon
3,716
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

February 17, 2023

Project location map

901 Fairmont Ave, Glendale, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.