Published February 7, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a transportation facility in Chino, California. Completed plans call for site work for a transportation facility.

State Contractors Class C-57 License is required. Construction estimate is $151,200. No bid may be withdrawn after the scheduled bid opening, or within sixty (60) days thereafter. The County reserves the right to reject any or all bids, to waive technical errors, discrepancies or informalities of a bid not affected by law, if to do so seems to best serve the public interest. For information regarding this project, contact Marian Michael, Project Manager, at (909) 531- 1582. DO NOT CONTACT THE DESIGN CONSULTANT. All technical questions to be submitted to the Project Manager in writing via email at Marian.Michael@res.sbcounty.gov. The subject line of the email should include the project number, as found in the bid documents, along with the project name and RFI. All questions must be submitted no later than October 7, 2021 at 4:00 p.m. No questions will be answered within seventy-two hours of the bid opening. The work to be performed under this contract generally consists of furnishing equipment, materials, labor, and supervision required to drill and construct up to six (6) groundwater piezometers at up to four (4) locations in Chino, San Bernardino County, California. The final number and locations of piezometer installations will be selected by the San Bernardino County Real Estate Services and Project Management (County) and Tetra Tech, Inc. (Tetra Tech) with approval from permitting agencies. To the extent practical, drilling and staging locations will be selected by Tetra Tech and the County to allow ready access and minimal disruption of site activities and impacts to surrounding environmental conditions. The purpose of the piezometers is to monitor groundwater elevations within the riparian area. Figure 1 presents a site vicinity map, and Figure 2 shows the drilling/piezometer locations. Three (3) piezometer installation locations are within riparian areas on United States Army Corps of Engineers (USACE)-owned land approximately 1.5 miles southwest of Chino Airport, and one (1) optional location is on the City of Chino Hills property. Two locations will have dualcompletion piezometers installed (identified as PZ-05A/B and PZ-07A/B), and up to two locations will have a single-completion piezometer installed (identified as PZ-08 and optional piezometer PZ-06). A site plan showing the location of dual-completion piezometer cluster PZ05A/B, located between El Prado Road and Mountain Avenue on USACE-owned land used as El Prado Golf Course, is included as Figure 3. Site plans showing the locations of piezometers PZ-07A/B and PZ-08, located near Pine Avenue and Euclid Avenue on El Prado Golf Course, are included on Figures 4 and 5. Optional piezometer PZ-06 will be located on property owned by the City of Chino Hills off Fairfield Ranch Road (near Big League Dreams Chino Hills baseball park) as shown on Figure 6. For this task, drilling and piezometer installation will include the following general items: o Mobilize, including the ability to move drill rig freely from one location to the next; o Drill utilizing a CME-85 or equivalent hollow-stem auger (HSA) drill rig; Hand auger to 5 feet below ground surface (bgs) with a diameter equivalent to the maximum outer diameter of the drill casing in order to ensure clearance of underground utilities and other obstructions; o Collect soil samples using a 1.5-foot split-spoon sampler or a 5-foot core barrel; o Provide and install well casing and screen; o Install filter pack, transition sand, and bentonite aquifer isolation seal at depths as specified by the onsite geologist below the water table using the tremie method; o Construct piezometers with above-grade wellhead completions; o Transport investigation derived waste (IDW) to storage containers located at staging area(s), locations to be determined based on accessibility and permit approval; o Waste containerizing, profiling, manifesting, transportation, and disposal; o Decontaminate all drilling, sampling, and piezometer installation equipment; o Provide site security during drilling/piezometer installation; o Perform equipment cleanup, demobilization, and site restoration; o Provide materials and supplies for conducting piezometer development; o Prepare California Department of Water Resources (DWR) well completion reports. o Right-of-way (ROW) permit(s) will not be required to be obtained by the Contractor for any wells under this contract. o Right-of-entry (ROE) agreement(s) will be obtained by the County for work on USACE-owned and City of Chino Hills land and will not be required to be obtained by the Contractor under this contract.

Award

Transportation Terminals

$146,474.00

Public - County

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
528
Active Projects
195
Bidding Soon
3,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2021

November 19, 2021

Project location map

7000 Merrill Ave, Chino, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.