Demolition, site work, renovation and addition to an educational facility in Jacksonville, Florida. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of October 31, 2024 construction is underway. The construction manager RFP follows below. _______________________________________________________________________________________________________________________________________________________ The owner has selected a Construction Manager. A timeline for construction has not yet been established. The University of North Florida Board of Trustees, a public body corporate, announces that the services of a Construction Manager are required for pre-construction services, the development of a GMP, and construction services for the remodel of Bldg. 10 and construction of an addition connecting Bldg. 10 to Bldg. 42. on UNF's campus at 1 UNF Drive, Jacksonville, FL 32224. The total project includes the remodeling of both floors of Building #10 and a new addition connecting Coggin College of Business Building 42 and Building 10. The project is broken down into Phase II A and Phase II B. Phase II A includes remodeling of the first floor of Building #10. The Construction Manager will provide pre-construction services through the development of the bid documents. Once the bid documents are complete the Construction Manager will provide a GMP for construction. Phase II B includes remodeling the second floor of Building #10 and a new addition connecting the two existing buildings. The Construction Manager will provide cost estimating services for the conceptual design of Phase II B. When funding is identified for Phase II B the Construction Manager Agreement will be amended to include providing the remaining pre-construction services for the development of the bid documents. Once the Phase II B Bid Documents are completed the Construction Manager will develop a GMP for construction. Only Phase II A is funded at this time. Phase II B is UNF's #1 priority project request to the State for funding. Harvard Jolly has been hired to provide full Design and Construction Administrative Services for Phase II A. Harvard Jolly's scope of services also includes providing a master plan and conceptual design for Phase II B. When funding is identified then Harvard Jolly's Contract will be amended to include providing the rest of the Design and Construction Administrative Services for Phase II B. The estimated construction budget for Phase II A is $4,000,000. The estimated construction budget for Phase II B is $26,000,000 Construction Management Services include: pre-construction services that include but are not limited to cost estimates, constructability reviews, code compliance, and project schedules; development of a GMP; construction services to remodel Building 10 and provide an addition connecting Building 10 to Building 42. The Construction Manager will work with University of North Florida (UNF) staff and the UNF selected Design Team for the project through the design and construction process Bonds Bid, Payment, and Performance Bonds will be required with the submission of a Guaranteed Maximum Price. Liquidated Damages Liquidated damages shall be assessed in the amount of $1,200 for each and every calendar day elapsing between the date fixed for Substantial Completion and the date Substantial Completion shall have been fully accomplished. Questions Deadline Tuesday, July 5, 2022, at 12:00 PM UNF Bid Portal, Q&A Board Response to Questions Friday, July 8, 2022 UNF Bid Portal, Q&A Board Interviews (if required) Tuesday, August 25, 2022 (Tentative) TBD

Under Construction

Educational

$26,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
41
Bidding Soon
683
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2022

October 22, 2024

img_map_placeholder

1 University of North Fl Dr, Jacksonville, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.