BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Estes Park, Colorado. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Apr 27, 2022 Contract Award Number: 140P1222C0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: MSCWJEC97PN7 Contractor Awarded Name: BAIRCO CONSTRUCTION, INC. Contractor Awarded Address: Lovell, WY 82431-9627 USA Base and All Options Value (Total Contract Value): $2670205.3 ROMO PMIS #240839 306571 - Waterline Rehab Phase 7 & 8 a) This acquisition is being conducted as a total small business set-aside. The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in clause 52.204-8 in section "K" of this solicitation. b) Estimated Price Range: Between $1,000,000 - $5,000,000 (note the estimated price range per the allowable ranges in FAR 36.204.) c) Refer to section "L" for information regarding a pre-proposal site visit. d) Information and requirements stated in sections "B" through "J" & attachments noted in section "J" apply to this solicitation and the subsequent contract. e) Refer to section "L" for proposal submittal requirements. f) Offerors shall submit proposals and questions, and acknowledge solicitation amendments as stated in section "L" of this solicitation g) Contract Type - Firm Fixed Price Project Location: This project is located in Rocky Mountain National Park, Estes Park, Colorado. The project area near the Headquarters Area on the east side of the park, is approximately 3 miles southwest of Estes Park, CO. The Work consists of the following: Base Contract: The Work includes replace existing 4-inch and 6-inch waterline with 6-inch, 4- inch and 2-inch high density polyethylene (HDPE) by open trench methods. Work includes furnishing and installation of fire hydrants, valves, and appurtenances, extending new service lines into existing buildings, installation of air release/vacuum valve vaults, placement of perforated drainage pipe in the same trench as waterlines, and pavement patching areas disturbed by waterline installation. Work also includes abandonment or removal of existing waterlines, fire hydrants, valves, valve vaults and appurtenances. Option A: The work includes the replacement of three (3) Air Release Valves along the supply line between Bear Lake Road and the Lead Tanks. This work includes removing existing manholes and air release/vacuum valve vaults, abandoning, or removing water lines and appurtenances and replacing the air release valves as indicated in the drawings. Option B: The Work includes parking area and site accessibility improvements at RV Site P along Sundance Circle. This work includes the grading, placement of concrete pavement, and crusher fines at RV Site P. The work also includes the relocation of RV utility hook ups at the site. All work in this project is within the boundaries of the Utility Area Historic District, which is a culturally significant area. D. Project will be constructed under a single prime contract. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 7:00 p.m., Monday through Friday, except when otherwise indicated. 1. No work shall be performed beyond normal working hours, on weekends or federal holidays without prior approval of the Contracting Officer. a. Public Utilities include: 1) Primary Power - Town of Estes Park - Power and Communication 2) Gas Lines - Xcel Energy 3) Telephone - Comcast and Century Link 4) Cable - Century Link, TDS b. NPS Utilities include: 1) Water 2) Sewer 3) Secondary Power 4) Propane Gas 5) Telephone 6) Cable 7) Fiber Optics *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,670,205.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
107
Bidding Soon
1,602
All Active Projects
661
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 11, 2022

May 6, 2022

February 20, 2023

img_map_placeholder

1000 US-36, Estes Park, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.