Published January 20, 2022 at 7:00 PM

Updated September 15, 2023

Site work, paving and new construction of a mixed-use development in Key West Nas, Florida. Completed plans call for the construction of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

As of January 20, 2022, this project has not been awarded, bids and permits are currently under review with Monroe County. A timeframe for award has not been established. Please be advised that it is the bidders sole responsibility to ensure delivery of their bid and waiting until the bid opening to address or confirm your bid submission delivery will result in your bid being rejected. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. If any person contemplating submitting a bid for the proposed contract is in doubt as to the meaning of any part of the proposed Contract Documents, he may submit to the Engineer, Jacobs Engineering Group, 200 West Forsyth Street, Suite 1520, Jacksonville, Florida 32202, EMAIL: Lasa.Ennis@jacobs.com a written request for an interpretation of the proposed documents. This document covers work at Key West International Airport (EYW) to construct the Aircraft Overflow Apron and one stub taxiway. The project also includes the construction of mitigation areas to compensate for the wetland areas that will be impacted with the Aircraft Overflow Apron. The Aircraft Overflow Apron also includes the construction of overhead lights, new taxiway edge lights, and new taxiway signs. The existing signs will also be renamed to accommodate for the additional stub taxiway. The area will be regraded and additional drainage features will be constructed to accommodate for the additional impervious areas. Work is anticipated to start on or about January 2022 and be completed by October 2022. Access points, staging areas, and haul routes are as shown on Appendix A. All work within this contract will be performed by the contractor at the direction of the Airport with all airfield work coordinated by the Resident Project Representative (RPR). All AOA construction activity is supervised by an Airport Operations Personnel who is fully trained in Part 139, airfield construction management requirements and airfield operating procedures. The Resident Project Representative (RPR), Airport Operations Personnel, or other designated airport representatives with ultimate responsibility to ensure compliance with safety regulations and Airport Rules and Regulations, may order the contractor to suspend operations and move personnel, equipment, and materials to a safe location.

Bid Results

Transportation Terminals

$5,416,177.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Other Specialties, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Gabions, Gabion Mattresses, Special Foundations and Load-Bearing Elements, Caissons, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Turf and Grasses, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Concrete Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
27
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

February 7, 2022

img_map_placeholder

3491 S Roosevelt Blvd, Key West Nas, FL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Aircraft Overflow and Mitigation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.