BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chapel Hill, North Carolina. Completed plans call for site work for a water / sewer project.

Direct all inquiries concerning this RFP to: Jovana Amaro Purchasing Agent Phone: 919-245-2651 Email: jamaro@orangecountync.gov This project consists of providing and installing a single private sewer service lateral in accordance with OWASA specifications and all applicable Town building and plumbing codes. The work also includes a mandatory preliminary site investigation (to be conducted prior to submittal of your bid) and post-construction site restoration to pre-construction conditions (e.g. restoration of gravel or pavement sidewalks/driveways (if needed), regrading, raking, seeding/re-sodding, etc.). Based on available record drawings, the existing sewer service stub-outs to which the private sewer service laterals will be connected range from approximately 4-ft deep to approximately 16-ft deep Sewer Service Lateral Connections: - Provider shall apply for and secure all applicable plumbing and/or code-specific permits from the Town of Chapel Hill or the Town of Carrboro Permits and Inspections Divisions, depending on the jurisdictional area in which the work is being performed, prior to starting work. - Provider shall provide any traffic control or other safety measures according to the most current NCDOT, OSHA or other safety requirements related to the work being performed. - Excavate to existing ductile iron mechanical joint plug located at existing sewer service stub-out near property line. - Install 4-inch sewer service lateral with all fittings and appurtenances (Schedule 40 PVC pipe or ductile iron pipe, depending on site conditions) to connect existing dwelling's wastewater discharge system to existing sewer service stub-out near property line. - Cap existing wastewater line to septic tank. - Provider shall coordinate final inspections and secure final certifications from the Town of Chapel Hill or the Town of Carrboro Permits and Inspections Divisions, depending on the jurisdictional area in which the work is being performed. - Restore site to pre-construction conditions, seed and straw all disturbed areas when done. Septic Tank Abandonment: - Provider shall apply for and secure an Existing System Authorization from Orange County Environmental Health, which is a no-cost permit to abandon the existing septic tank, prior to starting work. - Contractor shall provide any traffic control or other safety measures according to the most current NCDOT, OSHA or other safety requirements related to the work being performed. - The existing septic tank will need to be pumped by a North Carolina registered septage hauler and then properly abandoned. - An Orange County Environmental Health Inspector must be present when the septic tank is collapsed. - Restore site to pre-construction conditions, seed and straw all disturbed areas when done

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
122
Bidding Soon
1,778
All Active Projects
768
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 8, 2021

December 7, 2021

img_map_placeholder

1717 Purefoy Dr, Chapel Hill, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.