BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Alvin, Texas. Completed plans call for site work for a water / sewer project.

Scope of Work of the Contract includes the following: construction of lake/detention improvements. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The Contractor hereby agrees to begin work within ten (10) calendar days after written Notice to Proceed has been given by Engineer. Contractor hereby also agrees to achieve Substantial Completion of the Work within ___ calendar days (250 calendar days maximum) after the date of the written Notice to Proceed and to achieve Final Completion of the Work within ___ calendar days (280 calendar days maximum) after the date of the written Notice to Proceed. The successful bidder must furnish a Performance and a Payment Bond, each in the sum of 100 percent of the Contract Price and a two-year Maintenance Bond (naming the City of Manvel as Obligee) for 100 percent of the Contract Price from a surety company holding a permit from the State of Texas to act as surety

Bid Results

Water / Sewer

$8,041,345.00

Public - County

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
60
Bidding Soon
2,638
All Active Projects
1,080
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2021

November 16, 2021

img_map_placeholder

Multiple Locations, Alvin, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.