BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a mixed-use development in Los Angeles, California. Completed plans call for the demolition of a 47,082-square-foot, two-story above grade educational facility; for site work for a educational facility; water / sewer project; and for the renovation of a educational facility.

***The owner has determined a prequalified list of general contractors.*** This project will include demolition of existing Building 1800, a two-story approximately 47,082 GSF building, located at the center of campus, in preparation for the construction of the new Academic West building. Surrounding site work will also be partially demolished. In order to support existing earth grades and site amenities, a series of structural retaining walls will remain in place to stabilize the hillside and keep existing planters in place. A number of existing trees will also be protected in place and maintained through the length of demolition project. Scope of work also includes clearing all utilities from the project site, re-routing and reconnecting many of the utilities away from the site to maintain current utility services. Project scope also includes mechanical upgrades, replacing existing coils inside existing air handling units with new coils and patch and repair any finishes damaged during this upgrade in existing Great Hall Building 1900. Type of Award Lump Sum Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Q&A Deadline 10/01/2021 2:00 PM Project scope also includes mechanical upgrades, replacing existing coils inside existing air handling units with new coils and patch and repair any finishes damaged during this upgrade in existing Great Hall Building 1900. Pre bid meeting info One tap mobile +12532158782,,4922517375# US (Tacoma) +13462487799,,4922517375# US (Houston) Dial by your location +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 720 707 2699 US (Denver) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) Construction Duration to Substantial Completion: One Hundred Seventy Eight (178) Calendar Days. Substantial Completion to Final Completion: Sixty (60) Calendar Days. Estimated Range of Construction Cost: $5,500,000

Post-Bid

Educational

$5,500,000.00

Public - County

Demolition, Renovation, Site Work

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
109
Bidding Soon
1,982
All Active Projects
897
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

June 24, 2022

img_map_placeholder

6201 Winnetka Ave, Los Angeles, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.