BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

***As of 1/14/2022 the project was awarded to SRM/Stormwater Logistics - $1,394,955 For further information contact: Tim Hammer Senior CM Group Manager Tim.Hammer@aecom.com To attend the virtual public bid opening use the following Microsoft Teams Live Event link: https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_OWZmYmNlOGUtY2JlYS00Yzc4LWI4NjItZmI4ZDFjMzZmODA0%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252216ed5ab4-2b59-4e40-806d-8a30bdc9cf26%2522%252c%2522Oid%2522%253a%25225d40137b-72f8-471a-af9a-4fd7f45e2a64%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=e6810d51-0c4c-4227-a15a-b603d1abd337&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true The Aurora Highlands is a new master planned community located on the high plains prairie, approximately three miles south of Denver International Airport (DIA). The site is located east of Picadilly Road, south of 56th Avenue, north of 26th Avenue, and west of Powhaton Road (future alignment) with a portion also east of Powhaton south of 48th Avenue (future alignment). The development consists of approximately +/- 3,884.9 total acres which is anticipated to be developed with single family and multi-family homes, commercial, retail, industrial, and other amenities, reaching an estimated population of approximately 41,823 people at full build-out. AACMD is responsible for designing, constructing, and managing the construction of certain public improvements benefiting The Aurora Highlands, both onsite and offsite. The Contractor shall provide Stormwater Management Services for the Aurora Highlands master planned community (Development) for a period of one year, approximately November 1, 2021 to October 31, 2022. The Development is broken out into five Regions based on watersheds and drainage basins for permitting. See Attachment A, Site Map. The areas in white designate portions of the Development under the control of home builder contractors and are not included in the work area for this bid.

Award

Water / Sewer

$1,394,955.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
993
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2021

January 31, 2022

img_map_placeholder

To Be Determined, Aurora, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.