Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 11, 2022 at 8:00 PM

Updated April 17, 2025

Site work and paving for a mixed-use development in Kissimmee, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construction Services for Simpson Road Widening Phase I Project FM# 437482-1-54-01. The approximate length of the project is 6277.23 feet (1.19 miles) from Osceola Parkway to Boggy Creek Road. The Prime contractor must be FDOT prequalified in Work Classes: 7. Drainage (includes all storm drains, pipe culverts, culverts, etc.), 10. Flexible Paving (includes limerock, shell base and other optional base courses, soil-cement base, 11. Grading (includes clearing and grubbing, excavation, and embankment), and the Prime contractor or its subcontractors must be FDOT Prequalified in Work Classes: 12. Grassing, Seeding and Sodding, 16. Intelligent Transportation Systems Contractor Additional Experience, 27. Minor Bridges that contain span lengths not exceeding 50 feet (center to center of cap) and total length not exceeding 300 feet. A Minor Bridge shall not contain any type of construction listed under Major Bridges or Intermediate Bridges, 28. Pavement Marking (includes delineators, traffic stripe painting, and thermoplastics), 38. Roadway Signing, 39. Traffic Signal, 40. Other Work Classes Work. Question End Date 2/16/2022 12:00 PM New Q&A end date Monday, March 28, 2022 at 12:00 PM Local Time.

Award

Roads / Highways

$20,940,655.00

Public - County

Paving, Site Work

361

9

43

6

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
163
Bidding Soon
2,584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

June 13, 2022

Project location map

Simpson Rd, Kissimmee, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed