BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a transportation facility in Greer, South Carolina. Completed plans call for the renovation of a transportation facility.

As of April 14, 2022, this project has not yet been awarded. A timeline for award has not yet been established. RFP for Preconstruction and Construction services for a new GA Hangar-Site 1 project encompassing a 25k SF hangar, 5k SF office, parking and site development. It is the intent of the District to select and award the contract to a single firm/team. The Project will be located Greenville-Spartanburg International Airport (GSP) in Spartanburg County, South Carolina. The Project will primarily include construction of the following elements: o 25,000 SF hangar o 5000 SF office space - cold, dark shell o 30 stall parking lot o Utilities and site work The Project Team consists of the organizations noted in Attachment A. The Project is currently in the schematic design phase of the engineering effort. The first course of action for the CMC is to provide a high-level estimate for the project as captured by the existing design documents at the "design development" level. A Project sketch is provided for your reference in Attachment B. The sketch is representative of the related work, the specific scope shall be determined during the completion of the design documents for the project. The contract award will result in the selection of a CMC to provide preconstruction services, construction management and general construction services for the Project. The District reserves the right to alter the proposed Scope of the Project, for the purpose of this Request for Proposal (RFP) and to lead the evaluation of the submitted proposals. It is envisioned that construction will start once plan check comments are incorporated into the design for final design documentation and approval of the GMP.

Post-Bid

Transportation Terminals

$500,000.00

Public - County

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
53
Bidding Soon
837
All Active Projects
375
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.