BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Boulder City, Nevada. Design plans call for the construction of a transportation facility; and for site work for a transportation facility.

As of August 20, 2024, an engineer has been selected and this project is in the design phase. Construction anticipated to start in 2025/2026. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). An Air Traffic Control Tower will improve public safety through the separation of aircraft. The FAA recommends that an Air Traffic Control Tower be constructed when annual operations reach 100,000 takeoffs and landings per year, the Boulder City Municipal Airport estimates show that the Airport has reached the operational threshold as defined by the FAA. The City applied to the Contract Tower Program and was accepted with a Cost Benefit Ratio or B/C Ratio of 2.23, a B/C Ratio of 1.0 or greater is required to be accepted into the program *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Transportation Terminals

$11,635,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
390
All Active Projects
142
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

img_map_placeholder

Airport Rd, Boulder City, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.