BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Livermore, California. Completed plans call for the renovation of a fire / police facility; and office development.

Interior renovation of storage space into a new office/Real Time Awareness Center with partitions, impact resistant windows, new doors, new floor and wall finishes, new dropped ceiling system, hvac system modifications, new ductwork, new lighting, power and conduits, new data/communication conduits, small kitchen counter, upper cabinets, partial space under existing staircase, utility trenches at existing slab for new sanitary line, power/data expansion and security control and fire suppression system. Engineer's Estimated Cost: $495,000 to $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pre-Qualification for Bidders: Not Required Project Duration: 60 Work Days Liquidated Damages: $2,000.00 Per Work Day Bid Bond Percentage: 10% Dial by your location +1 669 900 6833 US (San Jose) +1 346 248 7799 US (Houston) +1 253 215 8782 US (Tacoma) +1 312 626 6799 US (Chicago) +1 929 205 6099 US (New York) +1 301 715 8592 US (Washington DC) Meeting ID: 858 7122 6767 Passcode: 575830 Find your local number: https://us06web.zoom.us/u/kevJzbG5Un

Award

Office

$472,000.00

Public - City

Renovation

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
96
Bidding Soon
2,022
All Active Projects
784
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2021

November 19, 2021

img_map_placeholder

1110 S Livermore Ave, Livermore, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.