BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2021 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a bridge / tunnel in Santa Barbara, California. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

***As of December 8, 2021, the project has not yet been awarded. Project will be awarded on January 11, 2022.*** Low Water Crossing Replacement, New Bridge 1.6 Miles West of State Highway 33 In the 1st Supervisorial District Q&A Deadline 10/29/2021 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% General Description 1430 ft. long, 33 span CIP Slab supported on five column piers and cast-in-drilled- hole (CIDH) piles Multiple in-channel work windows are anticipated to complete construction

Bid Results

Bridges / Tunnels

$15,962,283.00

Public - County

New Construction, Site Work

98

37

14

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
71
Bidding Soon
753
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2021

January 18, 2022

Project location map

Foothill Rd, Santa Barbara, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.