BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Indianapolis, Indiana. Completed plans call for the renovation of a fitness / recreation center.

Online Q&A : Yes Q&A Deadline : October 7, 2021 4:00 PM (EDT) The Indianapolis Airport Authority (IAA) is requesting quotes from qualified vendors for the renovation of restrooms on Level 2 of the Terminal Building at Indianapolis International Airport to include two shower rooms. The project is referenced herein as "IND Fitness Center Showers project." PROJECT OBJECTIVES: Construct new shower rooms as detailed in the contract documents (drawings and specifications). The project includes minor demolition, new walls and doors, new finishes, new plumbing, and minor mechanical and electrical work. GENERAL REQUIREMENTS 1. Contractor shall provide all labor and equipment for the Project at the Indianapolis International Airport as indicated in the attached documents. The Base Quote shall consist, of but is not limited to: a. Demolish existing walls, door, toilet partitions, flooring, ceiling, plumbing, and toilet accessories. b. Construct new walls and ceilings. Install new doors, frames and hardware. c. Install new wall and ceiling finishes, new resinous flooring, and room signs. d. Install new shower units and associated plumbing and floor drains. e. Modify existing exhaust system and smoke detectors. f. Modify existing electrical systems and install new lights. 2. All work will be performed as outlined in the documents included with this request. 3. The Contractor may store/stage equipment and materials at a designated staging area approved by the IAA. All equipment and materials must be removed immediately following completion of the work. 4. The work shall be completed during daytime hours on Monday through Friday only unless otherwise approved by the IAA. 5. All work will be inspected for adherence to the plans and specifications by the IAA or its designated representative(s). 6. It is the Contractor's responsibility to field-verify all measurements, locations, areas and existing materials. 7. Contractor's work will be taking place within an active office area. The contractor must contain dust and debris within Contractor's work area, and adjacent active work areas and surfaces shall be free of dust and debris. The contractor shall be responsible to clean adjacent surfaces on a daily basis - or at the end of each workday - to the satisfaction of the owner. 8. Contractor and their employees shall always be easily identifiable and shall have identifying markings on all vehicles. 9. Contractor shall promptly report any damage to Airport real estate, property, or equipment. A report shall consist of verbally informing the IAA or its designated representative the day the damage occurs as well as submitting a written report to the IAA by the close of the next business day after the damage occurred. 10. Contractor will be responsible for any damage resulting from his work or negligence. 11. Contractor shall report any safety issues to the IAA or its designated representative. 12. Contractor shall have a ready means of communication through cell phone while they are operating on-site so their efforts can be redirected as required by the IAA or its designated representative. 13. Contractor will not be required to employ the services of an IAA approved Security Escort or badged employee dedicated to security work for this project. The Owner's overall supplier diversity goal for this project is 28% comprised of 15% MBE, 10% WBE and 3% VBE participation

Award

Fitness / Rec Centers

$98,370.00

Public - State/Provincial

Renovation

9

13

5

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
32
Bidding Soon
704
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2021

November 15, 2021

img_map_placeholder

To Be Determined, Indianapolis, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.