Renovation of a multi-residential development in Reno, Nevada. Completed plans call for the renovation of a multi-residential development.

As per Addendum 2, this project has been cancelled with a plan to re-solicitate in the future. The timeline for rebid is currently unknown. (as of 11/02/2021) Work to be completed in 120 consecutive calendar days Said bids will be publicly opened at the above place, time and date by a RHA representative. Proposals for CF projects that exceed $25,000 will not be considered unless accompanied by cashiers/certified check or bid bond in the amount equal to 5% of the bid, made payable to the Reno Housing Authority. Performance and Payment Bonds required for all HUD projects that exceed $25,000. RHA reserves the rights to reject any/or all bids, to waive any irregularities or informalities in any bid or in the bidding, and to determine the low bidder. Remove sixteen (16) existing Air-Cooled Chiller units and replace them with a similar new chiller installed in the existing chiller location at Silverada Manor. 2. Work includes disconnection and reconnection of the existing electrical feed to serve the new chiller, miscellaneous piping, fittings, couplings, and pipe insulation as required for a complete and operational system. Scope of Work: 1. Remove sixteen (16) existing Air-Cooled Chiller units and replace them with a similar new chiller installed in the existing chiller location at Silverada Manor. 2. Work includes disconnection and reconnection of the existing electrical feed to serve the new chiller, miscellaneous piping, fittings, couplings, and pipe insulation as required for a complete and operational system. 3. Work shall consist of furnishing all necessary labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals to provide all work shown on the drawings. 4. Contractor to supply all materials, labor, and equipment required to perform work. 5. Contractor shall remove existing PAC72d2 Drake Air-Cooled Chiller located on the exterior of each mechanical room. 6. Install new PAC72D3-T3-Zd (6 Ton) Drake Air-Cooled Chiller. 7. Remove existing supply and return chilled water piping up to isolation valves and replace with new supply and return lines and new isolation valves at the location of the previous valves. 8. Remove existing supply and return motor and pumps and replace with stainless steel pumps per manufacturer's recommendations. 9. Contractor shall remove and replace the two existing pumps in each mechanical room. The new water chiller pumps must meet the requirements for the new air-cooled chiller unit. 10. Remove and replace strainer per manufacturer's recommendations. 11. Contractor shall ensure that existing water line supports provide stable, permanent support for the piping. Contractor shall install additional or supplemental piping support to provide load-bearing support throughout entire piping system. No piping weight should be exerted onto the chiller connections or piping unions. 12. Contractor shall provide, schedule, and arrange for Drake factory-certified start-up. Contractor will provide operational and maintenance training as recommended by the manufacturer to train RHA maintenance staff. 13. Contractor shall provide all operating maintenance manuals and parts instructions to include parts listings of equipment and other materials installed. 14. Contractor will provide manufacturer's warranty on all equipment installed including extended warranty items. Contractor will submit warranty information for the equipment to the anufacturer on behalf of RHA. Contractor will provide copies of all submitted warranty information to the RHA prior to closeout and final payment. 15. All work shall be completed following the manufacturer's recommended installation requirements unless otherwise specified. All dimensions are shown for information only. Contractor shall field verify all dimensions and site conditions. 16. Completed work will be inspected and accepted by the RHA upon completion. Work not completed to the satisfaction of the RHA will be corrected within three (3) workdays

Bid Results

Multi-Residential

$960,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
239
All Active Projects
86
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2022

February 7, 2022

img_map_placeholder

1400 Silverada Blvd, Reno, NV

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.