Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a multi-residential development in Reno, Nevada. Completed plans call for the renovation of a multi-residential development.
As per Addendum 2, this project has been cancelled with a plan to re-solicitate in the future. The timeline for rebid is currently unknown. (as of 11/02/2021) Work to be completed in 120 consecutive calendar days Said bids will be publicly opened at the above place, time and date by a RHA representative. Proposals for CF projects that exceed $25,000 will not be considered unless accompanied by cashiers/certified check or bid bond in the amount equal to 5% of the bid, made payable to the Reno Housing Authority. Performance and Payment Bonds required for all HUD projects that exceed $25,000. RHA reserves the rights to reject any/or all bids, to waive any irregularities or informalities in any bid or in the bidding, and to determine the low bidder. Remove sixteen (16) existing Air-Cooled Chiller units and replace them with a similar new chiller installed in the existing chiller location at Silverada Manor. 2. Work includes disconnection and reconnection of the existing electrical feed to serve the new chiller, miscellaneous piping, fittings, couplings, and pipe insulation as required for a complete and operational system. Scope of Work: 1. Remove sixteen (16) existing Air-Cooled Chiller units and replace them with a similar new chiller installed in the existing chiller location at Silverada Manor. 2. Work includes disconnection and reconnection of the existing electrical feed to serve the new chiller, miscellaneous piping, fittings, couplings, and pipe insulation as required for a complete and operational system. 3. Work shall consist of furnishing all necessary labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals to provide all work shown on the drawings. 4. Contractor to supply all materials, labor, and equipment required to perform work. 5. Contractor shall remove existing PAC72d2 Drake Air-Cooled Chiller located on the exterior of each mechanical room. 6. Install new PAC72D3-T3-Zd (6 Ton) Drake Air-Cooled Chiller. 7. Remove existing supply and return chilled water piping up to isolation valves and replace with new supply and return lines and new isolation valves at the location of the previous valves. 8. Remove existing supply and return motor and pumps and replace with stainless steel pumps per manufacturer's recommendations. 9. Contractor shall remove and replace the two existing pumps in each mechanical room. The new water chiller pumps must meet the requirements for the new air-cooled chiller unit. 10. Remove and replace strainer per manufacturer's recommendations. 11. Contractor shall ensure that existing water line supports provide stable, permanent support for the piping. Contractor shall install additional or supplemental piping support to provide load-bearing support throughout entire piping system. No piping weight should be exerted onto the chiller connections or piping unions. 12. Contractor shall provide, schedule, and arrange for Drake factory-certified start-up. Contractor will provide operational and maintenance training as recommended by the manufacturer to train RHA maintenance staff. 13. Contractor shall provide all operating maintenance manuals and parts instructions to include parts listings of equipment and other materials installed. 14. Contractor will provide manufacturer's warranty on all equipment installed including extended warranty items. Contractor will submit warranty information for the equipment to the anufacturer on behalf of RHA. Contractor will provide copies of all submitted warranty information to the RHA prior to closeout and final payment. 15. All work shall be completed following the manufacturer's recommended installation requirements unless otherwise specified. All dimensions are shown for information only. Contractor shall field verify all dimensions and site conditions. 16. Completed work will be inspected and accepted by the RHA upon completion. Work not completed to the satisfaction of the RHA will be corrected within three (3) workdays
Bid Results
Multi-Residential
$960,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2022
February 7, 2022
1400 Silverada Blvd, Reno, NV
Related To This Project
Reno, NV
Bid Date: Dec 16 2021
Reno, NV
Bid Date: Jan 04 2022
Reno, NV
Bid Date: Nov 30 2021
Reno, NV
Bid Date: Jan 06 2022
Reno, NV
Bid Date: Jan 11 2022
Reno, NV
Bid Date: Dec 08 2021
Reno, NV
Bid Date: Oct 11 2023
Reno, NV
Bid Date: Sep 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.