BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a municipal facility in Kansas City, Missouri. Completed plans call for site work for a municipal facility.

KCSC desires that Disadvantaged Business Enterprises (DBE) have a maximum opportunity to participate in the performance of City contracts. The project has an overall DBE participation goal, and only firms that have been certified by the Missouri Regional Certification Committee (MRCC) and perform a Commercially Useful Function (CUF) are eligible to satisfy the DBE goal. The KCSC Quality Management Plan (QMP) and its associated implementing project procedures establish and document the quality management system and represent the quality planning for the various phases of the Streetcar Project in response to the technical and quality requirements of the Contract. The following site and project descriptions have been developed from information provided by HDR and site reconnaissance by TSi. The general project area is shown below: The Kansas City Streetcar Extension project is planned to include extending the existing streetcar alignment along Main Street from Crown Center to the University of Missouri - Kansas City (UMKC) in Kansas City, Missouri. The southernmost point of the alignment is near UMKC at the corner of Brookside Blvd. and East 51 st St. Along this southernmost portion of the alignment, three small retaining walls are planned to be constructed with total heights ranging from approximately five feet to eight feet. Global stability analysis is not required to be performed for retaining walls with heights of five feet or less, therefore global stability will only be performed for the two retaining walls in this region with approximate wall heights greater than five feet. TSi understands that electrical power for the streetcar will be through overhead lines attached to catenary poles (Overhead Contact System or OCS). The poles are planned to be supported by drilled shafts. The axial loads on the OCS poles are light with lateral loads typically being the critical condition. Near the proposed streetcar extension alignment, construction is planned to include a total of five structures for the Traction Power Substation (TPSS) locations. These structures are anticipated to bear on shallow foundations.

Post-Bid

Municipal

$40,000.00

Public - City

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
0
Bidding Soon
673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

December 10, 2021

Project location map

Main St, Kansas City, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.