BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a stadium in Montreal, Quebec. Completed plans call for the renovation of a stadium.

Reference number : 1530848 Review Title : Replacement of the sliding doors of the Olympic Stadium (97-061) Deadline for receipt of complaints: 2021-10-12 Electronic submission accepted: Yes, in a single submission document Expected duration of the contract (in months): 8 The works consist mainly in the supply of labor, materials, equipment, material and services necessary for the execution of the works relating to the replacement of the sliding doors of the Olympic Stadium. The content of this article should not be considered as limiting. For more details and details, refer to the Plans and Specifications and other documents forming part of this mandate. These works include, but are not limited to: Mobilization and organization of the site; The installation of site fences and temporary partitions; Door demolition work and any related system; Supply and installation of sliding doors and all their components; Distribution work of empty conduits of network cables; Electrical connection work on the doors; Complete cleaning and maintenance of the site on a daily basis; Board and travel expenses for all workers and subcontractors; The evacuation of demolition waste specific to its work, off the site, in an appropriate place and according to the standards in force; Management of noise, dust, water or any other contaminant specific to its work; Provision of certifications; The tests and trials requested; Acceptance of the work. The doors that are concerned by this mandate represent phase 1, and are doors 1 to 6, for a total of nine (9) doors. Cable entry work in conduits, and door access control (card reader, intercom, etc.) are not included in the contractor's mandate. Before carrying out the work, the contractor must provide work procedures which must be approved by the Olympic Park. Ventilation of the work site area is entirely the responsibility of the contractor and he must control fumes outside the work area so as not to harm users.

Award

Arenas / Stadiums

$865,225.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
126
Bidding Soon
1,664
All Active Projects
709
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 11, 2022

img_map_placeholder

4545 Av. Pierre-De Coubertin, Montreal, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.