BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Aurora, Ohio. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The awarded contract is to Engelke Construction. Anticipated start date is Jan 3, 2022. The Bidder must include a Bid Guaranty and Contract Bond for 100% of the amount of their bid or a certified check in the amount of 10% of their total bid. See Section 153.54 of the Ohio Revised Code. Portage County Prevailing Wages and Equal Employment Opportunity requirements are applicable to this Project. The Bidder may be subject to a Pre-Award Affirmative Action Compliance Review in accordance with Section 123:2-5-01 of the Ohio Administrative Code including a review of the Bidder's employment records and an on-site review This Project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity Business Development Program. The Bidder isrequired to submit with their Bid and with their Bidder's Qualificationsform, certain information about the EDGE-Certified Business Enterprise(s) participating on the Project with the Bidder. Refer to subparagraph 6.1.12 of the Instructionsto Bidders. The EDGE Participation Goal for the Project isfive percent (5%). The percentage is determined by the contracted value of goods, services, materials, and labor that are provided byEDGE-certified business(es). The participation is calculated on the total amount of each awarded contract. Technical questions should be referred to: Ryan McNutt at FMD Architects; 2841 Riviera Drive, Fairlawn, Ohio 44333; Telephone: 330-836-2343 (Ext. 2140); FAX: 330-836-7359; E-mail: RMcnutt@FMDArchitects.com. E-mail is preferred. The school district reserves the right to reject any or all bids. Project Location: Aurora Schools - Multi-Use Building 119 W. Pioneer Trail Aurora, Ohio 44202 I. Estimated NTP: Monday, December 6, 2021 J. Begin Work on Site: Monday December 13, 2021 Project consists of work on the upper floor of the Aurora Schools Multi-Use Building.

Under Construction

Educational

$98,228.00

Public - City

New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
63
Bidding Soon
1,041
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2021

January 3, 2022

img_map_placeholder

119 W Pioneer Trail, Aurora, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.