Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Austin, Texas. Completed plans call for site work for a bridge / tunnel; road / highway; and sidewalk / parking lot.
Construction of an arterial road and associated infrastructure including grading, roadway, bridge, storm sewer, water quality, landscaping, sidewalks, and erosion controls. This section describes the Project in general and provides an overview of the extent of the Work to be performed by the CONTRACTOR. Detailed requirements and extent of Work is stated in the applicable Specification Sections and shown on the Drawings. CONTRACTOR shall, except as otherwise specifically stated herein or in any applicable part of these Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, and other facilities and services necessary for proper execution, testing, and completion of the Work. Any part or item of the Work which is reasonably implied or normally required to make the installation satisfactorily operable shall be performed by the CONTRACTOR and the expense thereof shall be included in the applicable unit prices or lump sum prices bid for the Work. It is the intent of these Specifications to provide the OWNER with the complete system. All miscellaneous appurtenances and other items of Work that are incidental to meeting the intent of the Specifications shall be considered as having been included in the applicable unit prices or lump sum prices bid for the Work even though these appurtenances and items may not be specifically called for in the Bid Documents. The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of William Cannon Drive Phase 3, as shown on the plans, regardless of quantities and units as may be reflected in the bid proposal form. The Project is located from a starting point at Cardinal Bloom Loop (approximately 1520 feet east of the intersection of William Cannon Drive and McKinney Falls Parkway) and extending east approximately 1 3/4 -mi. to the stub-out of the west bound lanes constructed under William Cannon Drive Phase 2 (approximately 400 feet west of U.S. Highway 183) in Travis County, Texas. Carma Easton LLC ("Owner") on behalf of Pilot Knob Municipal Utility District No. 1 (the "District") and Travis County, Texasisrequesting sealed written Bidsfor furnishing all labor, materials, equipment,supervision, and incidentals, and for performing all Work required for William Cannon Drive Phase 3 (the "Project") located at a starting point of Cardinal Bloom Loop (approximately 1520 feet east of the intersection of William Cannon Drive and McKinney Falls Parkway) and extending east approximately 1 3/4 -mi. to the stub-out of the west bound lanes constructed under William Cannon Drive Phase 2 (approximately 400 feet west of U.S. Highway 183) in Travis County, Texas. The Project consists of the following: construction of an arterial road and associated infrastructure including grading, roadway, bridge, storm sewer, water quality, landscaping, sidewalks, and erosion controls.
Post-Bid
Bridges / Tunnels
$370,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2021
December 9, 2021
W William Cannon Dr, Austin, TX
Related To This Project
Austin, TX
Bid Date: Jun 13 2019
Austin, TX
Bid Date: Nov 30 2021
Austin, TX
Bid Date: Jan 28 2021
Austin, TX
Bid Date: Mar 04 2020
Austin, TX
--
Austin, TX
Bid Date: Jan 04 2019
Austin, TX
Bid Date: Dec 17 2019
Austin, TX
Bid Date: Mar 04 2021
Austin, TX
Bid Date: Feb 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.