BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Indianapolis, Indiana. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

Complete streets rehabilitation of the Moms St, corridor from the bridge spanning Eagle Creek to the intersection at Harding St. Includes construction of new sidewalk, retaining walls, curbing, bus pads, ADA curb ramps, milling of the existing asphalt and repair of concrete joints, as well as resurfacing with new asphalt. A separate storm sewer system will be installed from Warman Ave. to Tremont St to separate the existing CSO system located within those bounds. New inlets and existing inlets will be installed/relocated to the new curb lines. A Bid Bond or certified check in an amount not less than five percent (5%) of the amount bid must be submitted with each Bid. A one hundred percent (100%) Performance and Payment Bond will also be required of the successful Bidder This Work will be funded by the City of Indianapolis. The participation goal for Minority Business Enterprise (MBE) for this contract is fifteen percent (15%). The participation goal for Women Business Enterprise (WBE) for this contract is eight percent (854). The participation goal for Veteran Business Enterprise (VBE) is three percent (3%). The participation goal tor Disability-owned Business Enterprise (DOBE) is one percent (1%). All Bidders will be subject to the MBE/WBE/VBE/DOBE Business Utilization Plan (''Utilization Plan"), of the City of Indianapolis. In evaluating a Bidder's responsibility, the City will consider the Bidder's Affirmative Action plan The City of Indianapolis reserves the right to reject any or all bids or to waive any informalities and to accept the bid which it deems most favorable to the interests of the City after all bids have been examined and canvassed. Project Range: $4,000,000 - $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Proposal Schedule: Substantial Completion - October 31, 2023 Final Completion - December 29, 2023 Liquidated Damages $1,500/day for Substantial Completion $100/day for Final Completion

Bid Results

Sidewalks / Parking Lot

$6,568,000.00

Public - City

Paving, Site Work

199

12

43

9

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
33
Bidding Soon
757
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2021

December 27, 2021

img_map_placeholder

W Morris St, Indianapolis, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.